CSU Learning Space Priorities

choose fields Records: 401 | clear search














5.60MND3009482010-08-01LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2010-08-01: Technology updated in room.
pic
5.22MRP1010492010-08-01LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2001-06-27: VPs postpone renovation plans and target DH 106+106a instead
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: VPs would like to combine smaller rooms to make a larger room. This could be combined with MR 1002.
4.89LIB3021702011-05-15LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2011-02-01: Priority per Dean Varshney. Worth a major renovation- postponed for next year.
review for major renovation, still has SP control that is not easily replaced by 226
4.85ARC1016802010-08-302005-09-01LabAdvanced Smart2010-08-30: Technology updated in room.pic
4.61ALP122702011-11-21LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
4.47AMD308482012-02-17LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2012-02-17: Installed speakers
2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-11-21: Installed new speakers. Numerous issues with layout and instructor desk.
2011-10-29: Installed new Panasonic FW300 projector.
2011-02-01: Priority per Dean Trainer.
pic
4.46ARC1007462012-03-092005-09-01LectureAdvanced Smart2012-03-09: Replaced old DVD/VCR player with a Panasonic PV-D4745 in the podium.
2010-08-30: Updated technology. Added a podium.
pic
4.43ARC1008462012-01-052005-09-01LectureAdvanced Smart2012-01-15: Updated technology and added a podium.
2011-02-01: Candidate for full so we are going to leave existing SP controls. Postpone minor update for major update.
pic
4.42MRP10001442012-01-272009-09-01LectureAdvanced Smart2012-06-29: Installed Wolfvision Eye-12 ceiling document camera.
2012-01-27: Installed Audio Technica ES915 podium microphone.
2011-02-01: Complete seating renovations. Concrete risers are prohibitively expensive. VPs want to target seating with another source, not our renovation money, since seating is so expensive. Postponed.
2009-09-01: Renovated facilities and technology.
pic
4.35DLN10042142012-03-092010-08-31LectureAdvanced Smart2012-03-09: Installed podium microphone
2010-08-30: Renovated facilites and technology.
pic
4.26DH209542011-07-18LectureBasic Smart2013-04-23: VPs would like to combine smaller rooms to make a larger room. also, they want room updated to an advanced smart classroom with full sized podium, controller, zone lighting, laptop connection, and pc in the room.
2011-07-18: Technology updated
pic
4.19ALP156602011-11-21LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2011-02-01: Priority per Dean Baldini. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
4.12AMD151602011-11-21LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2012-01-15: whiteboards, ceiling, and wall in needs of maintenance. Shallow wide layout provides poor viewing angles and limits student interaction. Could be made into a larger room with AMD 152 as requested by VPs.
2011-02-01: Very poorly shaped room with high infrastructure costs.
2011-11-21: Replaced both projectors with Panasonic PT-FW300U's and replaced torn projector screen
pic
4.07EUR105492012-02-17LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2012-02-17: Installed Panasonic PT-FW300U projector and Extron MLC-104 Controller
pic
4.06ARC1009462012-06-042005-09-01LectureAdvanced Smart2012-06-04: Technology updated and added a new podium and Wolfvision EYE-12 ceiling document camera.
2012-01-15: Targeted for technology update and new podium Summer 2012
2011-02-01: Great candidate. However, we've done several ARC rooms already. This would be an easy pickup when funds are lower. Candidate for full so we are going to leave existing SP controls.
Postpone
pic
4.02SHS240672010-10-21LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2010-10-21: Replaced SP panel with an MLC104
pic
4.02EUR320472012-01-20LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2012-01-20: Installed new speakers.
2010-10-01: Replaced SP control panel with MLC 104.
pic
4.02EUR10849LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2011-02-01: Poor network infrastructure access.
pic
4.01MND10031502012-01-272009-09-01LectureAdvanced Smart2012-01-27: Installed Audio Technica ES915 podium microphone.
2011-02-01: Need to update seating to complete renovation.
2009-08-15: technology updated; media booth removed from back.
2009-09-01: Renovated facilities and technology.
pic
3.85RVR10151162009-09-012009-09-01LectureAdvanced Smart2011-02-01: Need to renovate seating and get correct number of permanent seats to complete renovation.
2009-09-01: Renovated facilities and technology
2012-02-03 GS: Broekn TLP 700 replaced with MAC 00-05-A6-06-6A-77
pic
3.84ARC3004392009-09-012005-09-01LectureAdvanced Smart2009-09-01: Renovated facilities and technology.pic
3.84ARC3006312009-09-012005-09-01LectureAdvanced Smart2012-07-10: Technology updated. Installed Wolfvision EYE-12 ceiling document camera and the podium was switched with the ARC 1009 podium.
2009-09-01: Renovated facilities and technology.
pic
3.83MND3013882009-09-012009-09-01LectureAdvanced Smart2009-09-01: Renovated facilities and technology.pic
3.81MND1015902011-08-152012-09-16LectureAdvanced Smart2012-10-1: New seating and risers installed, old AV booth removed.
2012-08-24: New carpet, paint, whiteboards
2012-01-20: Seating budget available reduces cost to renovate student area. Target for new seating, risers, and removal of old AV booth Summer 2012
2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Rotating stage may make this prohibitive with current budget limits. VPs want to target seating with another source, not our renovation money, since seating is so expensive. Seats are falling apart and square footage could be increased with removal of media booth. Technology upgrades needed.
data wires are in ceiling, Infocus projestor, 3 screens, one projector
pic
3.80DLN1010552010-08-302010-08-31LectureAdvanced Smart2011-08-15: whiteboard added to from. One more request at back
2011-02-01: Just need to add some additional whiteboards.
2010-08-30: Renovated facilites and technology.
pic
3.79AMD152602011-04-08LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2012-01-15: whiteboards, ceiling, and wall in needs of maintenance. Shallow wide layout provides poor viewing angles and limits student interaction. Could be made into a larger room with AMD 151 as requested by VPs.
2010-09-01: Install DVD Cubby, paint, lights
2011-02-01: Very poorly shaped room with high infrastructure costs. Priority per Dean Varshney.
pic
3.75MRP1002392010-07-16LectureBasic Smart2001-06-27: VPs postpone renovation plans and target DH 106+106a instead
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: VPs would like to combine smaller rooms to make a larger room. This could be combined with MR 1010.
3.73TAH100360LectureBasic Smart2012-01-15: Numerous wiring and technology issues increase importance. Targeted for technology update and replacement podium Summer 2012
2011-02-01: Priority per Dean Varshney. Risers, narrow room dimensions, and doors on fron wall make it a candidate for a future major renovation. Would need to take out risers and rotate room to meet design criteria. Doing AMD 153 for CBA instead. Current technology is up to speed.
pic
3.71MND10051472012-01-272009-09-01LectureAdvanced Smart2012-01-27: Installed Audio Technica ES915 podium microphone.
2011-02-01: VPs want to target money with another source, not our renovation money since seating is so expensive. Postponed. Seating is falling apart and room could be made more interactive.Need to complete previous renovations.
wireless mic needs batteries
2009-09-01: Renovated facilities and technology.
pic
3.68MRP1001802012-01-272009-09-01LectureAdvanced Smart2012-01-27: Installed Audio Technica ES915 podium microphone.
2011-02-01: Need to replace seating and risers, but it'll be expensive with concrete risers.
2009-09-01: Renovated facilities and technology. Removed massive media booth
pic
3.52BNC1025982008-09-012008-09-01LectureAdvanced Smart226 plugged in, old podium, we're not going to wire projector until a touch panel is put into roompic
3.50BRH210502012-01-20LectureBasic Smart2012-01-20: Installed a MTP-UTAD Interface Panel
2010-09-01: 2 mounts (T.V. and ?) at the front of the room need to be removed. Paint touch up needed around the room, especially where desks hit the wall. Floor trim in the back of the room is missingl.
2011-02-01: Good layout and reasonable costs for an intermediate upgrade. However, 2 other ALS rooms are already getting podiums.
infocus
pic
3.49MND4004502011-08-152011-08-15LectureAdvanced Smart2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Broken interface panel and increase in tickets Spring 2011.
pic
3.49TAH1026602011-08-262011-08-26LectureAdvanced Smart2011-02-01: Priority per Dean Varshnay.
pic
3.46MND4000472011-08-152011-08-15LectureAdvanced Smart2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Wiring interface panel is not working correctly
completed
pic
3.46HMB109402012-06-28LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2012-06-28: Technology updated. Currently already has an Extron MLC 104 controller. Installed new Extron MTP UTAD laptop connection and Panasonic PT-FW430U Projector.
2011-02-01: Priority per Dean Trainer.
pic
3.45MRP1012492010-08-01LectureBasic Smart2011-02-01: VPs would like to combine smaller rooms to make a larger room. However, this room already holds near fifty.
hole covered by phone number sticker, 226 hooked up

3.43MND3011722010-01-152010-01-15LectureAdvanced Smart2010-01-15: Technology updated.
2012-02-03 GS: Defective TLP700 replaced out with new unit MAC 00-05-A6-08-41-CC
pic
3.43ALP204722012-04-102010-01-15LectureAdvanced Smart2012-04-10: Replace old DVD/VCR player with a JVC DR-MV150B DVD/VCR.
2011-02-01: Need to remove cork board to complete renovation. Priority per Dean Varshney. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
3.43DH110492011-07-19LectureBasic Smart2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2010-07-19: Technology updated
pic
3.42SQU44340LectureSee Equipment2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2012-01-20: Targeted for facilities and technology maintenance Summer 2012
2011-06-27: VPs postpone renovation plans due to budget limitation
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Third highest priority per Dean Lascher. Also prioritized by Dean Trainer- who requested a PC as well as laptop connection.
pic
3.40AMD309352011-11-21LectureBasic Smart2012-06-20: Technology updated. Installed new Extron MTP UTAD laptop connection.
2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-10-22: Installed new Panasonic FW300 projector
2010-09-01: Several stained and broken ceiling panels, hole in the wall. Excess hook system. Exposed electrical box front of room. Front-left and center-left fluorescent ceiling lights out.
2011-02-01: Priority per Dean Trainer.
pic
3.39BRH110542011-08-26LectureBasic Smart2012-10-12: Technology updated. Installed new Extrom MTP UTAD and URA.
2012-06-07: Technology updated. Installed new Panasonic PT-FW300U projector.
2012-02-08: Request for laptop connection by Professor Sarah Strand
2010-09-01: Room needs paint, espcially by the controller. Front wall under corkboard id very dirty. Some of the floor trim is ripped missing near front left door corner. Doors need touch up paint.
2011-02-01: Priority per Dean Varshney. Double doors and layout are problematic.
needs bigger screen; some issues; possible target for podium, infocus
pic
3.34MND2007602010-01-15LabAdvanced Smart2010-01-15: Technology updated and podium added.pic
3.32BNC1029442012-11-162005-09-01LectureBasic Smart2012-11-16: Technology updated with Extron UTAD laptop connection and 2 new Panasonic PT-FW430U projectors.
2010-11-18: Replaced dual controllers with single controller.
3.28AMD219492012-01-03LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
pic
3.26FLS10631252012-04-272011-01-24LectureAdvanced Smart2012-04-27: Updated, installed podium mics.
2011-01-21: Technology updated in room.
pic
3.24MND2003542012-01-27LabBasic Smart2012-01-27: VGA Switch was installed for laptop use
2011-02-01: PC lab, not used that often
pic
3.24DH210282011-03-09LectureSee Equipment2013-04-23: VPs would like to combine smaller rooms to make a larger room. also, they want room updated to an advanced smart classroom with full sized podium, controller, zone lighting, laptop connection, and pc in the room.
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Priority per Dean Tooker. VPs want to avoid major renovations in DH because it's potentially slated for demo. Room layout is too narrow.
Winter, not smart
2001-06-27: VPs postpone renovation plans due to budget limitation
pic
3.23SQU456752009-09-012009-09-01LectureAdvanced Smart2009-09-01: Renovated facilities and technology.
3.23MND2009482012-01-20LectureBasic Smart2012-01-20: New Panasonic projector and laptop interface panel installed.
2010-10-29: Technology updated
3.22FLS10501252012-04-272011-01-24LectureAdvanced Smart2012-04-27: Updated, installed new podium mic.
2011-01-21: Technology updated in room.
pic
3.20BRH218492011-12-10LectureBasic Smart2010-09-01: Remove TV mount, touch up paint near door at walls where desks hit. A couple lights out, but not entire panels.
2011-02-01: Need to upgrade more ALS rooms.
pic
3.18CLV145652011-08-26LectureBasic Smart2012-03-28: Anthropology faculty have request improvements, including a whiteboard.
2012-02-21: Space Management passed along a request for a whiteboard/chalkboard to be installed on the east wall of the lecture room.
2010-09-01: Lights out. One panel in first row, three panels in second row. Small tear in screen. Could be fixed with duct tape. Ceiling needs to be cleaned
2011-02-01: Layout is a little challenging. However, it's so wide that the space in front between the doors might work.
pic
3.16ARC3009482009-09-012005-09-01LectureAdvanced Smart2009-09-01: Renovated facilities and technology.pic
3.16SQU3011202008-08-012008-08-01LectureAdvanced Smart2008-08-01: Older style podium with 226 panel
2013-04-02: Replaced projector screen and document camera
pic
3.15AMD1501222012-02-032011-08-15LectureAdvanced Smart2012-02-03: Installed podium microphone
2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Temporary technology setup needs to be replaced. Largest room with outdated technology. Facilities work could be extensive.
old podium in place, 226 in place, don't wire projector
pic
3.15ALP144602011-11-21LectureBasic Smart2010-09-01: Small damage to ceiling tile. Some water damage to a few ceiling tiles. The doors need refinishing.
2011-02-01: Double doors at front of room prevent decent layout without major renovations. Priority per Dean Baldini. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
3.14BRH104552011-11-21LectureBasic Smart2011-02-01: Priority per Dean Varshney. No existing controller makes adding new one difficult in short term.
Postpone for Podium. Tiny screen and infocus projector; possible target for podium; has CBA computer,
pic
3.14AMD263342012-01-03LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2012-01-03: Installed a new Extron MLC-104 Controller and Extron MTP-UTAD Interface Panel
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-10-29: Installed new Panasonic FW300 projector.
pic
3.13MND1022432010-08-01LectureBasic Smart2010-08-01: Technology updatedpic
3.13SLN2002822012-03-092009-09-01LectureAdvanced Smart2012-03-09: Installed podium microphone
2009-09-01: Renovated facilities and technology.
pic
3.12KDM145702012-07-30LectureAdvanced Smart2012-07-30: Technology updated. Added a new podium and the screen was replaced with a new Da Lite 34464LC 8ft. screen.
2012-01-30: Targeted for technology update and new podium Summer 2012
2012-01-27: Art department has expressed interest in getting the room updated. Room has no whiteboards, screen is barely working and threatening to get stuck in up or down position.
2013-04-02: Projector Screen Replaced
pic
3.10MND200454LabBasic Smart2011-02-01: Lab, postpone
pic
3.08MND1026342010-09-10LectureBasic Smart2012-05-22: Installed new MTP UTAD controller.
2010-09-10: Epson projector, 226 in place, wired
2013-04-02: Projector screen replaced
pic
3.07MND1020432010-08-01LectureBasic Smart2010-08-01: Technology updatedpic
3.05BRH10930LectureSee Equipment2012-01-20: Targeted for facilities and technology maintenance Summer 2012
2001-06-27: VPs postpone renovation plans due to budget limitation
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Priority per Dean Trainer.
pic
3.03BRH204452011-08-26LectureBasic Smart2010-09-01: Touchup paint needed on door and areas on walls. Transparency cart needs to be cleaned. Lights are out. Some sort of wooden mount at front of room should be removed.
2011-02-01: Priority per Dean Varshney.
pic
3.03AMD31440LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
pic
3.03AMD252402011-05-25LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2010-09-01: Paint near MLC-104. Door needs paint. Back left wall as you face it needs paint.

pic
3.03FLS1049802011-01-212011-01-24LectureAdvanced Smart2011-01-21: Technology updated in room.pic
3.01SQU338752009-09-012009-09-01LectureAdvanced Smart2009-09-01: Renovated facilities and technology.
2013-04-02: Replaced projector
pic
3.00MRP1014492010-07-16LectureBasic Smart2011-02-01: VPs would like to combine smaller rooms to make a larger room. However, this room already holds near fifty.
3.00AMD260402011-11-21LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-11-21: Replaced InFocus Projector with Panasonic PT-FW300U Projector
2011-02-01: Recommended Ethnic Studies Chair Fong.
pic
2.99SQU316752008-09-012008-09-01LectureAdvanced Smart2008-09-01: Facilities and technology renovatedpic
2.99AMD217492012-01-03LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2012-01-03 Installed Extron MLC-104 Controller
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
pic
2.99FLS1029502011-01-212011-01-24LabAdvanced Smart2012-05-12: Installed wired microphone in podium.
2011-01-21: Technology updated in room.
2.98ALP235602011-01-21LectureBasic Smart2011-01-21: Installed MTP-UTAD Interface Panel, Panasonic Projector
2011-02-01: Highest priority per Dean Lascher. Room is very long and narrow, making it not conducive to classroom design standards. Will take significant resources- move doors and windows. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
add new projector; will probably not be wired, since we've maxed out our number of rooms
pic
2.98ALP212452012-06-06LectureBasic Smart2012-06-06: Technology updated. Installed new Extron MLC 104 controller with Extron MTP-UTAD laptop connection and Panasonic PT-FW300U projector.
2010-09-01: Touch up paint where desks hit wall near entrance to room and on back wall as well. The door needs to be refinished - it is really dirty and worn. A few lights need replacing, but there are no entire panels out (just one bulb in a few panels.)
2011-02-01: Need to upgrade some SSIS rooms. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
2.97AMD1531222012-03-022011-08-15LectureAdvanced Smart2012-03-02: Installed podium microphone
2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Largest room with outdated technology. Facilities work could be extensive. Priority per Dean Varshnay.
dual projectors beyond scope for this Summer; possible old podium
pic
2.95LIB12834LectureBasic Smart2011-02-01: Recommended Ethnic Studies Chair Fong.
hole in wall by 226
2.94MND1024372010-08-01LectureBasic Smart2010-08-01: Updated panel.pic
2.94DH11130LectureSee Equipment2012-01-20: Targeted for facilities and technology maintenance Summer 2012
2001-06-27: VPs postpone renovation plans due to budget limitation
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Wait till Winter. Priority per Dean Tooker and recommended by space management.
pic
2.86ALP218502011-12-03LectureBasic Smart2011-02-01: Good layout and access to infrastructure. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
2.86EUR109452011-08-152011-08-15LectureAdvanced Smart2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Room has network infrastructure present, reducing costs. Also, few HHS classrooms have been upgraded recently outside of Nursing.
pic
2.85BRH208652010-08-25LectureBasic Smart2010-08-25: Technology updated, SP-Controller replaced with a 226 panel.pic
2.78RVR1006372010-08-01LectureBasic Smart2010-08-01: Hole in wall covered with plate. Projector replaced.pic
2.77MND4008502011-08-152011-08-15LectureAdvanced Smart2011-08-27: Room equipment and facilities renovated
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Professor Strasser has requested an upgrade.
room has 226
no VGA cable
pic
2.77FLS1033502011-01-212011-01-24LabAdvanced Smart2011-01-21: Technology updated in room.
2.75FLS1051402011-01-212011-01-24LectureAdvanced Smart2011-01-21: Technology updated in room.pic
2.74DH212862009-09-012009-09-01LectureAdvanced Smart2009-09-01: Renovated facilities and technology.pic
2.74EUR112492011-08-152011-08-15LectureAdvanced Smart2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Room has network infrastructure present, reducing costs. Also, few ED classrooms have been upgraded recently.
pic
2.73MRP1016392010-07-16LectureBasic Smart2010-07-16: Technology updated in room.
2.73TAH1025552010-08-01LectureBasic Smart2010-08-01: Technology updated in room.
2.73EUR101402012-02-17LectureBasic Smart2012-02-17: Installed MTP-UTAD laptop interface panelpic
2.71LIB65482009-09-012009-09-01LectureAdvanced Smart2012-07-25: Updated with a smaller mid-size podium and installed new Wolfvision EYE-12 ceiling document camera.
2009-09-01: Renovated facilities and technology.
pic
2.69RVR1012372010-08-01LectureBasic Smart2012-07-30: Replaced ripped screen and Inline 3260 laptop connection.
2010-08-01: Technology updated
pic
2.69YSM127602011-08-152011-08-15LectureAdvanced Smart2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Priority per Dean Baldini.
pic
2.68HMB202602011-08-152011-08-15LectureAdvanced Smart2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Priority per Dean Trainer. WEt table at front, pendant lights, and chalk boards increase costs of intermediate upgrade.
pic
2.65ALP236602010-01-152010-01-15LectureAdvanced Smart2011-02-01: Priority per Dean Varshney. Already completed last year. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
2010-08-01: Technology updated and podium added
pic
2.65MND400726LectureSee Equipment2012-01-20: Targeted for facilities and technology maintenance Summer 2012
2011-02-01: Recommended by space management.
pic
2.64EUR111492011-08-26LectureBasic Smart2011-02-01: Room has network infrastructure present, reducing costs. Also, few ED classrooms have been upgraded recently.
pic
2.60DH213492012-04-062011-08-15LectureAdvanced Smart2012-04-06: Replaced the DVD/VCR player with a new Toshiba DVR620 DVD/VCR.
2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Second priority per Dean Lascher; excellent layout for for design.
needs new OVP, no CATV
pic
2.59MND2032292011-07-18LectureBasic Smart2010-007-18: Technology updated
2010-09-01: Broken/sagging ceiling tile front center of room. Hole in drywall behind door. Paint needed.
pic
2.59AMD250402011-11-21LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-12-22 Replaced SP Controller with Extron MLC-104 Controller

pic
2.57BRH214502012-04-06LectureBasic Smart2012-04-06: Replaced old Panasonic DVD/VCR player with a new Toshiba DVR620 DVD/VCR player.
2012-01-05: Updated technology in room. replaced Infocus projector with Panasonic projector, replaced panel and added new laptop interface devices.
pic
2.55MND2008352012-01-27LabBasic Smart2012-01-27: VGA switch installed for laptop use
2012-01-13: PC Lab no need to update technology.
pic
2.54ALP138492011-07-19LectureBasic Smart2011-09-01: Floor trim at back right hand corner of room is missing from the wall
2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
2.54AMD240402012-01-03LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2012-01-03 Installed Extron MLC-104 Controller
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
pic
2.52RVR2010322010-08-01LectureBasic Smart2010-08-01: Technology updated
2.52AMD262372012-01-04LectureBasic Smart2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-01-04: Installed a new MTP-UTAD Interface Panel
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-11-05: Installed new Panasonic projector.
2011-02-01: Requested by ETHN Chair Fong. Wants a built in PC.
pic
2.51TAH1007732011-08-26LectureBasic Smart2012-06-25: Technology updated. Installed new Panasonic PT-FW430U projector.
2011-08-26: Technology updated in room. Replaced panel with MLC 104.
2.50RVR1010372010-08-01LectureBasic Smart2010-08-01: Technology updated in room.pic
2.50LIB4021402012-01-03LectureBasic Smart2012-01-03:
2.49BRH114552012-03-09LectureAdvanced Smart2012-03-09: Replaced old projector with a new Panasonic PT-FW300U Projector.
2010-07-15: Technology updated in room.
pic
2.48BRH202652011-04-06LectureBasic Smart2012-06-08: Technology updated. Installed new Panasonic PT-FW300U projector.
2011-04-06: Updated Infocus projector
pic
2.48MND1030302012-05-22LectureBasic Smart2012-05-22: Technology updated: Installed new Panasonic PT-FW300U projector and MTP UTAD controller.
2011-07-19: Technology updated in room.
pic
2.46TAH1004452011-01-242011-01-24LectureAdvanced Smart2011-01-24: Wired 226 in wall for now; possible podium room, though it depends on connections between podium and projector.pic
2.46ALP22735LectureSee Equipment2011-02-01: Recommended by space management. Very loud AC. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
2.45CLV123542011-07-19LectureBasic Smart2011-02-01: long narrow room. Would take a lot to get it function- dual display system or facilities work.
right projector may need new bulb
2.44RVR1004372010-08-01LectureBasic Smart2010-08-01: Technology updatedpic
2.44RVR1002372010-08-01LectureBasic Smart2010-08-01: Technology updated in room.pic
2.44YSM11948LectureBasic Smartpic
2.43MRP2030402013-04-02LectureBasic Smart2013-04-02: Update classroom technology - projector, interface panel and fixed legacy wiring issue to speakers. Projector screen replaced
2.43EUR104512012-01-05LectureBasic Smart2012-01-05: Updated technology in room. Replaced Infocus projector with Panasonic projector, added new laptop interface devices.
2.43FLS1048402011-01-212011-01-24LabAdvanced Smart2011-01-21: Technology updated in room.
2.42DH107432012-05-31LectureBasic Smart2012-05-30: Technology updated. Installed Extron MTP UTAD laptop connection and new Panasonic PT-FW300U Projector.
2010-07-19: Technology updated
2010-09-01: Lights out - first row two panels, Holes in the wall need to be fixed where mount was removed
pic
2.41DH105492011-07-19LectureBasic Smart2012-06-05: Technology updated. Installed Panasonic PT-FW300U projector.
2011-07-19: Technology updated
2013-04-02: Projector screen replaced
pic
2.40LIB127342012-02-03LectureBasic Smart2012-02-03: Installed new laptop interface panel - Extron MTP-UTAD
2012-01-13: Suggested updates, wall by 226 needs paint
pic
2.40ALP232552011-07-19LectureBasic Smart2012-06-06: Technology updated. Installed new Panasonic PT-FW300U projector.
2010-09-01: Doors need refinishing, Touch up paint near door at bottom edge of wall... looks like something splashed.
2011-02-01: VPs do not want to renovate ALP because it's potentially slated for demo.
Equipment Picture missing
pic
2.40EUR106492013-04-02LectureBasic Smart2011-11-21: Technology updated in room.
2013-04-02: Replaced interface controller with UTAD/URA interface
2.39EUR103352011-12-03LectureBasic Smart2011-12-03: Technology updated in room.
2.38RVR1008372010-08-01LectureBasic Smart2010-08-01: Technology updated in room.pic
2.38DH106402011-08-152011-08-15LectureAdvanced Smart2011-02-01: Priority per Dean Tooker. Combined into single room.
pic
2.37DH108452012-06-05LectureBasic Smart2012-06-05: Technology updated. Installed new Extron MLC 104 controller with Extron MTP UTAD laptop connection and Panasonic PT-FW300U projector.pic
2.36ALP147252012-02-03LectureSee Equipment2012-02-03: Installed overhead transparency projector
2011-02-01: Recommended by space management. Very loud AC is disruptive. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
Not a Smart Classroom
pic
2.35SLN2003302011-05-25LabBasic Smart2011-02-01: Computer lab - postponed for renovation.
2.33SLN2004402012-01-03LectureBasic Smartpic
2.33ALP148452012-06-12LectureBasic Smart2012-06-12: Technology updated. Installed Extron MLC 104 controller with Extron MTP UTAD laptop connection and Panasonic PT-FW300U projector.
2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
2.32BRH203312011-03-09LectureSee Equipment2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Recommended by space management.
Not a Smart Classroom
2001-06-27: VPs postpone renovation plans due to budget limitation.
pic
2.31MND4005202012-01-13LectureSee Equipment2012-01-13: This is a conference Room and has just one Transparency Projector
2.30YSM135492011-07-19LectureBasic Smart2010-09-01: Touch up paint at front of room by raceway above controller and under front window. TV mount should be removed, but facilities will have to fill holes and paint. Does the old projector booth need to be in there? Flourescent light bulbs broken in front center and back right areas of classroom.
2010-09-01: Touch up paint at front of room by raceway above controller and under front window. TV mount should be removed. Does the old projector booth need to be in there? Flourescent light bulbs broken in front center and back right areas of classroom.

pic
2.30EUR113452011-08-05LectureBasic Smart2012-08-13: Replaced Infocus with a new Panasonic PT-FW300U projector.
2011-08-05: Technology updated in room.
2.29SLN2000402011-07-19LectureBasic Smart2012-05-30: Technology updated. Replaced Infocus projector with a new Panasonic PT-FW300U projector.
2011-07-19: Hole covered in wall with sticker.
2.29CLV134382013-04-02LectureSee Equipment2013-04-02: Updated classroom technology - projector, controller, interface
pic
2.28SQU128302011-07-19LectureBasic Smart2010-09-01: Room needs paint, can the metal and board thing above the controller be removed? (Facilities would need to paint and fill holes). Holes in wall under DVD player need to be filled (large holes 4 of them) 2 broken ceiling tiles.
2013-04-02: Replaced projector
pic
2.28DH206492012-05-29LectureBasic Smart2012-05-29: Technology updated. Installed Extron MLC 104 controller with MTP UTAD laptop connection and new Panasonic PT-FW300U Projector.pic
2.27LIB126352012-10-26LectureBasic Smart2012-10-26: Technology updated with Extron MLC 104 controller and MTP UTAD laptop connection.
2011-07-19: Technology updated in room.
pic
2.26MND102824LectureSee Equipment2012-01-20: Targeted for facilities and technology maintenance Summer 2012
2011-02-01: Recommended by space management.
pic
2.24SQU32535LectureBasic Smartpic
2.24SQU12232LectureBasic Smartpic
2.20CLV141452012-08-16LectureBasic Smart2012-08-16: Technology updated. Installed new Extron MLC 104 controller, Extron MTP UTAD laptop connection, and Panasonic PT-FW300U projector.
2.19AMD26130LectureSee Equipment2011-02-01: Recommended by Space management
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
pic
2.18DH207402012-05-29LectureBasic Smart2012-05-29: Technology updated. Installed Extron MLC 104 controller with MTP UTAD laptop connection and new Panasonic PT-FW300U Projector.pic
2.17EUR107552011-08-26LectureBasic Smart2011-08-26: Technology updated in room.
2.12CLV135382012-01-03LectureBasic Smart
2.11YSM117282011-02-01LectureSee Equipment2011-02-01: Recommended by space management.
pic
2.10ALP153382011-11-21LectureBasic Smart2012-06-15: Technology updated. Installed new Panasonic PT-FW430U Projector.
2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
2.10EUR114402012-01-05LectureBasic Smart2012-01-05: Updated technology in room. Replaced Infocus projector with Panasonic projector, added new laptop interface devices, speakers and AMP.
2.08SQU142302011-02-01LectureSee Equipment2011-02-01: Recommended by space management.
2.08EUR11545LectureBasic Smart
2.07SLN200130LabBasic Smart
2.05TAH1002312012-02-17LectureBasic Smart2012-02-17: Installed Panasonic PT-FW300U Projector and MLC-104 Controller
2012-02-03 Installed speakers
pic
2.01EUR315352013-04-02LectureBasic Smart2013-04-02: Updated classroom technology - projector, controller, interface
1.94SHS143322011-09-17LectureBasic Smart2011-09-17: Technology updated in room.pic
1.93CPS32740LectureSee Equipment
1.91TAH1027322010-10-01LectureBasic Smart2012-06-27: Technology updated. Installed new Panasonic PT-FW430U projector.
2010-10-01: Room now has MLC 104 controller.
pic
1.91DH214342012-05-24LectureBasic Smart2012-05-24: Technology updated. Installed Extron MLC 104 controller with MTP UTAD laptop connection and new Panasonic PT-FW300U Projector.pic
1.90DH208402012-05-30LectureBasic Smart2012-05-30: Technology updated. Installed Extron MTP UTAD laptop connection and new Panasonic PT-FW300U Projector.
2011-08-26: Technology updated
pic
1.89SQU450252012-04-14LectureBasic Smart2012-04-14: Updated technology. Replace old SP Control with a new MLC 104 controller. pic
1.88SHS26430LectureSee Equipment2011-02-01: Recommended by space management.
1.85MND103220LectureSee Equipment
1.83BRH101352012-06-27LectureBasic Smart2012-06-27: Technology updated. Installed new Extron MLC 104 controller with Extron MTP UTAD laptop connection and a Panasonic PT-FW430U projector. pic
1.83SHS25427LectureSee Equipment2011-02-01: Recommended by space management.
1.80YSM133302012-06-19LectureBasic Smart2012-06-19: Technology updated. Installed Extron MLC 104 controller with an Extron MTP UTAD laptop connection and a Panasonic PT-FW430U Projector. pic
1.78YSM141362012-06-20LectureBasic Smart2012-06-20: Technology updated. Installed Extron MLC 104 controller with an Extron MTP UTAD laptop connection and a Panasonic PT-FW430U Projector. pic
1.73MND300722LectureSee Equipment
1.70AMD36215LectureSee Equipment2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
1.69EUR102402013-04-02LectureBasic Smart2013-04-02: Updated classroom technology - projector, controller, interface
1.68SHS250352012-06-18LectureBasic Smart2012-06-18: Technology updated. Installed Extron MLC 104 controller with an Extron MTP UTAD laptop connection and a Panasonic PT-FW430U Projector.
1.65DH109332012-05-24LectureBasic Smart2012-05-24: Technology updated. Installed Extron MLC 104 controller with MTP UTAD laptop connection and new Panasonic PT-FW300U Projector.
1.63BRH20132LectureSee Equipmentpic
1.60BRH11530LectureSee Equipmentpic
1.60LSN230028LectureSee Equipmentpic
1.57SQU10226LectureSee Equipment
1.56EUR215402012-03-21LabBasic Smart2012-03-21: Updated new technology in the room. Installed new MTP-UTAD interface panel, MLC-104 controller, and Panasonic PT-FW300U projector.
2011-12-14: Priority per meeting between Sue Collins and La Tina Gago, Steve ODonnell, and Katy Romo. They would like the technology refresh to include a MLC-104 controller, MTP-UTAD Interface, and Panasonic projector. They are hopeful to have the Dean's approval to move forward with the refresh in January before classes resume.
2011-02-01: Priority per Dean Sheared.
1.50BRH10532LectureSee Equipmentpic
1.47BRH20930LectureSee Equipment
1.47ALP23130LectureSee Equipment2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
pic
1.47SHS145302012-06-15LectureBasic Smart2012-06-15: Technology updated. Installed Extron MLC 104 controller with an Extron MTP UTAD laptop connection and a Panasonic PT-FW430U Projector. pic
1.47SLN400820LectureSee Equipmentpic
1.47EUR211352012-03-22LabBasic Smart2012-03-22: Updated new technology in the room. Installed new MTP-UTAD interface panel and MLC-104 controller.
2012-01-20: Installed Panasonic projector.
2011-12-14: Priority per meeting between Sue Collins and La Tina Gago, Steve ODonnell, and Katy Romo. They would like the technology refresh to include a MLC-104 controller, MTP-UTAD Interface, and Panasonic projector. They are hopeful to have the Dean's approval to move forward with the refresh in January before classes resume.
2011-02-01: Priority per Dean Sheared.
1.43BRH11327LectureSee Equipmentpic
1.43SLN300818LectureSee Equipment
1.38CPS143190LabSee Equipment
1.38CPS151190LabSee Equipment
1.38EUR223402013-04-022013-04-02LabBasic Smart2011-02-01: Priority per Dean Sheared.
2013-04-02: Updated classroom technology - projector, controller, interface, speakers, screen, whiteboards

1.38CPS142338LabSee Equipment
1.35SHS101150LabSee EquipmentALS; THEA Department
This is a theater.
1.34EUR329302013-04-022013-04-02LabSee Equipment2011-02-01: Priority per Dean Sheared.
2013-04-02: Updated classroom technology - projector, controller, interface, speakers, screen, whiteboards
1.33MRP200030LabBasic Smart
1.32ALP20520LectureSee Equipment2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
1.29EUR30925LectureSee Equipment
1.28MND4011242012-01-03LabBasic Smart
1.27MRP200535LabSee Equipment2012-01-20: This is the back door of the classroom 2003
they are the same
1.26MND300225LabSee Equipment
1.25MND300624LabSee Equipment
1.24EUR301312012-03-20LabBasic Smart2012-03-20: Updated new technology in the room. Installed new MTP-UTAD interface panel, MLC-104 controller, and Panasonic PT-FW300U projector.
2011-12-14: Priority per meeting between Sue Collins and La Tina Gago, Steve ODonnell, and Katy Romo. They would like the technology refresh to include a MLC-104 controller, MTP-UTAD Interface, and Panasonic projector. They have Dean's approval to move forward with the refresh over Spring Break.
1.23EUR415302012-01-03LabBasic Smart2011-02-01: Priority per Dean Sheared.
1.22ARC1013402005-09-01LabBasic Smart
1.22EUR41320LectureSee Equipment
1.19MND300328LabSee Equipment
1.18CPS22345LabSee Equipment
1.18CPS22745LabBasic Smart
1.16MRP200225LabSee Equipment
1.15CPS20540LabSee Equipment
1.15CPS20940LabSee Equipment
1.12ALP22453LabSee Equipment2011-02-01: Priority per Dean Varshney. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
their fob doesn't work

Equipment Picture is missing
1.12MRP100922LabBasic Smart
1.11MRP100321LabBasic Smart
1.10MRP101130LabBasic Smart
1.10MRP100720LabBasic Smart
1.10MRP100520LabBasic Smart
1.10MND200220LabSee Equipment
1.07MRP400018LabSee Equipment
1.06MRP303036LabBasic Smart
1.06SQU42824LabSee Equipment2011-02-01: Dean Trainer has requested that this room be made Smart and given it a high priority.
1.05SLN101030LabSee EquipmentALS; THEA Department
Dance Studio
1.05LSN210730LabSee Equipment
1.05CPS32130LabSee Equipment
1.05LIB5830LabSee Equipment
1.04LSN210316LabSee Equipment
1.04FLS1016402011-01-212011-01-24LabBasic Smart
1.03MRP200115LabSee Equipment
1.03MRP200715LabSee Equipment
1.01MRP300130LabBasic Smart
1.01LSN211026LabSee Equipment
1.00AMD31318LabBasic Smart2012-02-17: Department Chair requested that projector be replaced.
0.99KDM28035LabBasic Smart
0.99SQU44618LabSee Equipment2011-02-01: Priority per Dean Trainer.
0.97LSN210422LabSee Equipment
0.95SQU45240LabBasic Smart
0.95CLV13130LabSee Equipment
0.95SHS13230LabSee EquipmentALS; THEA Department
Dance Space
0.95KDM16630LabBasic Smart
0.95MRP300724LabBasic Smart
0.93LSN220018LabSee Equipment
0.92ARC1015402005-09-01LabBasic Smart
0.92KDM26626LabSee Equipment
0.91MRP101325LabBasic Smart
0.91PLR101324LabBasic Smart
0.91SLN301815LabBasic Smart
0.91CPS31916LabSee Equipment
0.91CPS30916LabSee Equipment
0.91CPS31116LabSee Equipment
0.91KDM10725LabSee Equipment
0.91MND101420LabSee EquipmentANTH; SSIS Department
Archaeology Teaching Lab
0.90MRP500224LabSee Equipment
0.90KDM26424LabSee Equipment
0.90KDM17024LabSee Equipment
0.90KDM11324LabSee Equipment
0.90KDM10124LabSee Equipment
0.89ARC1014362005-09-01LabBasic Smart
0.89CPS30115LabSee Equipment
0.88LSN210514LabSee Equipment
0.87LSN210613LabSee EquipmentThere is only a transparency projector in this room and no other equipment.
0.86KDM16020LabSee Equipment
0.86SHS24920LabSee EquipmentALS; THEA Department
Action Lab
0.86ASL10620LabSee EquipmentNo Equipment
0.86ASL10820LabSee Equipment
0.86ASL11020LabSee Equipment
No Equipment
0.86KDM10420LabSee Equipment
0.86KDM13120LabSee Equipment
0.86MND101016LabSee EquipmentANTH; SSIS Department
Archaeology Lab
0.86FLS1047202011-01-212011-01-24LabBasic Smart
0.86FLS1013202011-01-212011-01-24LabBasic Smart
0.86FLS1017202011-01-212011-01-24LabBasic Smart
0.86FLS1018202011-01-212011-01-24LabBasic Smart
0.86FLS1019202011-01-212011-01-24LabBasic Smart
0.86FLS1020202011-01-212011-01-24LabBasic Smart
0.84CPS30310LabSee Equipment
0.84CPS32910LabSee Equipment
0.83PLR100224LabBasic Smart
0.83PLR100624LabBasic Smart
0.82SHS21916LabSee Equipment
0.81TAH100930LabBasic Smart
0.81SHS30015LabSee Equipment
0.79SQU21824LabSee Equipment
0.79SQU32624LabBasic Smartpic
0.79MND10129LabSee EquipmentANTH; SSIS Department
Archaeology Workroom
0.79MND40099LabSee Equipment
0.78EUR31335LabBasic Smart
0.77YSM19433LabBasic Smart
0.76SQU10430LabSee Equipment
0.76SQU22230LabBasic Smart
0.76ALP15231LabBasic Smart2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
0.76SLN300121LabBasic Smart
0.76AMD22035LabBasic Smart
0.75BRH20540LabSee Equipment
0.75SLN300320LabSee Equipment
0.74FLS103482011-01-212011-01-24LabBasic Smart
0.74FLS103282011-01-212011-01-24LabSee Equipment
0.74FLS103182011-01-212011-01-24LabBasic Smart
0.74FLS102882011-01-212011-01-24LabBasic Smart
0.74FLS103082011-01-212011-01-24LabBasic Smart
0.72SQU13224LabSee Equipment
0.72SQU23224LabSee Equipment
0.72SQU23624LabSee Equipment
0.72SQU24224LabSee Equipment
0.72SQU24624LabSee Equipment
0.72SQU32824LabSee Equipment
0.72SQU41624LabBasic Smart
0.72SQU41824LabBasic Smart
0.72SQU44424LabSee Equipment
0.72SQU53824LabSee Equipment
0.72SQU20824LabSee Equipment
0.72SQU11024LabSee Equipment
0.72SQU11824LabSee Equipment
0.72PLR100312LabSee EquipmentGEOL; NSM Lab
0.72PLR110112LabSee EquipmentGEOL; NSM Lab
0.71YSM19325LabSee Equipment
0.70RVR502937LabBasic Smart
0.70SLN103015LabSee Equipment
0.70SLN202215LabSee Equipment
0.70SLN401515LabSee Equipment
0.70SLN301615LabSee Equipment
0.70EUR30735LabBasic Smart
0.70AMD20914LabSee Equipment
0.69RVR101335LabBasic Smart
0.69HMB11630LabSee Equipment
0.69SQU21620LabSee Equipment
0.67RVR400332LabBasic SmartCE; ECS Department
Construction Management Lab
0.66RVR201330LabSee Equipment
0.66SQU21216LabSee Equipment
0.65HMB21024LabSee Equipment
0.65HMB11024LabSee Equipment
0.65HMB21624LabSee EquipmentThis room is lab. There is no equipment.
0.65HMB10224LabSee Equipment
0.65HMB12424LabSee Equipment
0.65SQU54815LabSee Equipment
0.65SQU55015LabSee Equipment
0.62SQU14012LabSee Equipment
0.62SQU51612LabSee Equipment
0.62AMD12416LabSee Equipment
0.62SQU52012LabSee Equipment
0.62SQU52212LabSee Equipment
0.61AMD20714LabSee Equipment
0.60SQU1309LabSee Equipment
0.59SQU5408LabSee Equipment
Booked all weeks until 08/09
0.59HMB22116LabSee Equipment
0.59HMB22016LabSee Equipment
0.59HMB20716LabSee Equipment
0.59RVR200120LabSee EquipmentCSC; ECS Department
Computer Science System Lab
0.59RVR200320LabSee EquipmentCSC; ECS Department
CSC Grad Lab
0.59RVR200919LabSee EquipmentCSC; ECS Department
Networks Lab
0.58SCL120832LabBasic Smart
0.58RVR200518LabSee EquipmentCSC; ECS Department
Networks Lab
0.57SCL121830LabBasic Smart
0.57RVR300917LabSee Equipment
0.56RVR100115LabSee EquipmentInside of 1007 which is a Advanced Instrumentation Lab.
0.56RVR300515LabBasic Smart
0.56RVR301515LabSee Equipment
0.56YSM1906LabSee Equipment
0.56RVR302215LabSee EquipmentECS; EEE Department
Computer Engineering Senior Project Lab
0.55RVR300113LabSee Equipment
0.54RVR100312LabSee Equipment
0.54RVR403312LabSee EquipmentCE; ECS Department
Environmental Engineering Lab (This room only has a screen.)
0.54RVR301312LabBasic Smart
0.54RVR301712LabBasic Smart
0.54RVR501912LabSee EquipmentECS; EEE Department
Microwave and Wireless Communication Lab
0.53AMD3024LabSee Equipment
0.53AMD3034LabSee Equipment
0.52RVR400110LabBasic Smart
0.52RVR400510LabSee Equipment
0.52RVR501710LabSee Equipment
0.51SCL132720LabSee Equipment
0.51SCL134920LabSee Equipment
0.49RVR10055LabSee Equipment
0.49SCL135716LabSee EquipmentECS; ME Department
Energy System Lab
0.49SCL110816LabSee EquipmentECS; EEE Department
Optical Engineering Lab
0.49SCL122416LabSee EquipmentCE; ECS Department
Hydraulics Lab
0.48SCL110214LabSee EquipmentECS;EEE Department
Electronic Power Lab
0.47SCL111812LabSee Equipment
0.47EUR42510LabSee Equipment
0.45EUR4238LabSee Equipment
0.44SCL11198LabBasic Smart
0.00SHS113415LabSee Equipment
0.00SQU42624LabSee Equipment
0.00LSN210813LabSee Equipment
0.00AMD24112LabSee Equipment
0.00SCL110120LabSee Equipment
ARC1010722005-09-01LabSee Equipment
ARC1011502005-09-01LabSee Equipment
LIB11802011-10-31LabAdvanced Smartpic
SCL132920LabSee Equipment
LIB153360LabBasic Smart
LIB152254LabBasic Smart
LIB5348LabSee Equipment
LIB202345LabBasic Smart
KDM268262008-08-29LabBasic SmartThe classroom belongs to the dean.
LIB20240Lab
Your query was:
SELECT * FROM priorities_view WHERE 1 ORDER BY rating DESC