|
|
|
|

|

|
|
|
|
|
|---|
| 5.60 | MND | 3009 | 48 | 2010-08-01 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2010-08-01: Technology updated in room.
| pic |
5.22 | MRP | 1010 | 49 | 2010-08-01 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2001-06-27: VPs postpone renovation plans and target DH 106+106a instead
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: VPs would like to combine smaller rooms to make a larger room. This could be combined with MR 1002.
| | 4.89 | LIB | 3021 | 70 | 2011-05-15 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2011-02-01: Priority per Dean Varshney. Worth a major renovation- postponed for next year.
review for major renovation, still has SP control that is not easily replaced by 226
| | 4.85 | ARC | 1016 | 80 | 2010-08-30 | 2005-09-01 | Lab | Advanced Smart | 2010-08-30: Technology updated in room. | pic | 4.61 | ALP | 122 | 70 | 2011-11-21 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| pic | 4.47 | AMD | 308 | 48 | 2012-02-17 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2012-02-17: Installed speakers
2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-11-21: Installed new speakers. Numerous issues with layout and instructor desk.
2011-10-29: Installed new Panasonic FW300 projector.
2011-02-01: Priority per Dean Trainer. | pic | 4.46 | ARC | 1007 | 46 | 2012-03-09 | 2005-09-01 | Lecture | Advanced Smart | 2012-03-09: Replaced old DVD/VCR player with a Panasonic PV-D4745 in the podium.
2010-08-30: Updated technology. Added a podium. | pic | 4.43 | ARC | 1008 | 46 | 2012-01-05 | 2005-09-01 | Lecture | Advanced Smart | 2012-01-15: Updated technology and added a podium.
2011-02-01: Candidate for full so we are going to leave existing SP controls. Postpone minor update for major update. | pic | 4.42 | MRP | 1000 | 144 | 2012-01-27 | 2009-09-01 | Lecture | Advanced Smart | 2012-06-29: Installed Wolfvision Eye-12 ceiling document camera.
2012-01-27: Installed Audio Technica ES915 podium microphone.
2011-02-01: Complete seating renovations. Concrete risers are prohibitively expensive. VPs want to target seating with another source, not our renovation money, since seating is so expensive. Postponed.
2009-09-01: Renovated facilities and technology. | pic | 4.35 | DLN | 1004 | 214 | 2012-03-09 | 2010-08-31 | Lecture | Advanced Smart | 2012-03-09: Installed podium microphone
2010-08-30: Renovated facilites and technology. | pic | 4.26 | DH | 209 | 54 | 2011-07-18 | | Lecture | Basic Smart | 2013-04-23: VPs would like to combine smaller rooms to make a larger room. also, they want room updated to an advanced smart classroom with full sized podium, controller, zone lighting, laptop connection, and pc in the room.
2011-07-18: Technology updated
| pic | 4.19 | ALP | 156 | 60 | 2011-11-21 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2011-02-01: Priority per Dean Baldini. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| pic | 4.12 | AMD | 151 | 60 | 2011-11-21 | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2012-01-15: whiteboards, ceiling, and wall in needs of maintenance. Shallow wide layout provides poor viewing angles and limits student interaction. Could be made into a larger room with AMD 152 as requested by VPs.
2011-02-01: Very poorly shaped room with high infrastructure costs.
2011-11-21: Replaced both projectors with Panasonic PT-FW300U's and replaced torn projector screen
| pic | 4.07 | EUR | 105 | 49 | 2012-02-17 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2012-02-17: Installed Panasonic PT-FW300U projector and Extron MLC-104 Controller
| pic | 4.06 | ARC | 1009 | 46 | 2012-06-04 | 2005-09-01 | Lecture | Advanced Smart | 2012-06-04: Technology updated and added a new podium and Wolfvision EYE-12 ceiling document camera.
2012-01-15: Targeted for technology update and new podium Summer 2012
2011-02-01: Great candidate. However, we've done several ARC rooms already. This would be an easy pickup when funds are lower. Candidate for full so we are going to leave existing SP controls.
Postpone | pic | 4.02 | SHS | 240 | 67 | 2010-10-21 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2010-10-21: Replaced SP panel with an MLC104
| pic | 4.02 | EUR | 320 | 47 | 2012-01-20 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2012-01-20: Installed new speakers.
2010-10-01: Replaced SP control panel with MLC 104.
| pic | 4.02 | EUR | 108 | 49 | | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2011-02-01: Poor network infrastructure access.
| pic | 4.01 | MND | 1003 | 150 | 2012-01-27 | 2009-09-01 | Lecture | Advanced Smart | 2012-01-27: Installed Audio Technica ES915 podium microphone.
2011-02-01: Need to update seating to complete renovation.
2009-08-15: technology updated; media booth removed from back.
2009-09-01: Renovated facilities and technology. | pic | 3.85 | RVR | 1015 | 116 | 2009-09-01 | 2009-09-01 | Lecture | Advanced Smart | 2011-02-01: Need to renovate seating and get correct number of permanent seats to complete renovation.
2009-09-01: Renovated facilities and technology
2012-02-03 GS: Broekn TLP 700 replaced with MAC 00-05-A6-06-6A-77 | pic | 3.84 | ARC | 3004 | 39 | 2009-09-01 | 2005-09-01 | Lecture | Advanced Smart | 2009-09-01: Renovated facilities and technology. | pic | 3.84 | ARC | 3006 | 31 | 2009-09-01 | 2005-09-01 | Lecture | Advanced Smart | 2012-07-10: Technology updated. Installed Wolfvision EYE-12 ceiling document camera and the podium was switched with the ARC 1009 podium.
2009-09-01: Renovated facilities and technology. | pic | 3.83 | MND | 3013 | 88 | 2009-09-01 | 2009-09-01 | Lecture | Advanced Smart | 2009-09-01: Renovated facilities and technology. | pic | 3.81 | MND | 1015 | 90 | 2011-08-15 | 2012-09-16 | Lecture | Advanced Smart | 2012-10-1: New seating and risers installed, old AV booth removed.
2012-08-24: New carpet, paint, whiteboards
2012-01-20: Seating budget available reduces cost to renovate student area. Target for new seating, risers, and removal of old AV booth Summer 2012
2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Rotating stage may make this prohibitive with current budget limits. VPs want to target seating with another source, not our renovation money, since seating is so expensive. Seats are falling apart and square footage could be increased with removal of media booth. Technology upgrades needed.
data wires are in ceiling, Infocus projestor, 3 screens, one projector | pic | 3.80 | DLN | 1010 | 55 | 2010-08-30 | 2010-08-31 | Lecture | Advanced Smart | 2011-08-15: whiteboard added to from. One more request at back
2011-02-01: Just need to add some additional whiteboards.
2010-08-30: Renovated facilites and technology. | pic | 3.79 | AMD | 152 | 60 | 2011-04-08 | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2012-01-15: whiteboards, ceiling, and wall in needs of maintenance. Shallow wide layout provides poor viewing angles and limits student interaction. Could be made into a larger room with AMD 151 as requested by VPs.
2010-09-01: Install DVD Cubby, paint, lights
2011-02-01: Very poorly shaped room with high infrastructure costs. Priority per Dean Varshney.
| pic | 3.75 | MRP | 1002 | 39 | 2010-07-16 | | Lecture | Basic Smart | 2001-06-27: VPs postpone renovation plans and target DH 106+106a instead
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: VPs would like to combine smaller rooms to make a larger room. This could be combined with MR 1010.
| | 3.73 | TAH | 1003 | 60 | | | Lecture | Basic Smart | 2012-01-15: Numerous wiring and technology issues increase importance. Targeted for technology update and replacement podium Summer 2012
2011-02-01: Priority per Dean Varshney. Risers, narrow room dimensions, and doors on fron wall make it a candidate for a future major renovation. Would need to take out risers and rotate room to meet design criteria. Doing AMD 153 for CBA instead. Current technology is up to speed. | pic | 3.71 | MND | 1005 | 147 | 2012-01-27 | 2009-09-01 | Lecture | Advanced Smart | 2012-01-27: Installed Audio Technica ES915 podium microphone.
2011-02-01: VPs want to target money with another source, not our renovation money since seating is so expensive. Postponed. Seating is falling apart and room could be made more interactive.Need to complete previous renovations.
wireless mic needs batteries
2009-09-01: Renovated facilities and technology. | pic | 3.68 | MRP | 1001 | 80 | 2012-01-27 | 2009-09-01 | Lecture | Advanced Smart | 2012-01-27: Installed Audio Technica ES915 podium microphone.
2011-02-01: Need to replace seating and risers, but it'll be expensive with concrete risers.
2009-09-01: Renovated facilities and technology. Removed massive media booth | pic | 3.52 | BNC | 1025 | 98 | 2008-09-01 | 2008-09-01 | Lecture | Advanced Smart | 226 plugged in, old podium, we're not going to wire projector until a touch panel is put into room | pic | 3.50 | BRH | 210 | 50 | 2012-01-20 | | Lecture | Basic Smart | 2012-01-20: Installed a MTP-UTAD Interface Panel
2010-09-01: 2 mounts (T.V. and ?) at the front of the room need to be removed. Paint touch up needed around the room, especially where desks hit the wall. Floor trim in the back of the room is missingl.
2011-02-01: Good layout and reasonable costs for an intermediate upgrade. However, 2 other ALS rooms are already getting podiums.
infocus | pic | 3.49 | MND | 4004 | 50 | 2011-08-15 | 2011-08-15 | Lecture | Advanced Smart | 2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Broken interface panel and increase in tickets Spring 2011. | pic | 3.49 | TAH | 1026 | 60 | 2011-08-26 | 2011-08-26 | Lecture | Advanced Smart | 2011-02-01: Priority per Dean Varshnay.
| pic | 3.46 | MND | 4000 | 47 | 2011-08-15 | 2011-08-15 | Lecture | Advanced Smart | 2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Wiring interface panel is not working correctly
completed | pic | 3.46 | HMB | 109 | 40 | 2012-06-28 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2012-06-28: Technology updated. Currently already has an Extron MLC 104 controller. Installed new Extron MTP UTAD laptop connection and Panasonic PT-FW430U Projector.
2011-02-01: Priority per Dean Trainer. | pic | 3.45 | MRP | 1012 | 49 | 2010-08-01 | | Lecture | Basic Smart | 2011-02-01: VPs would like to combine smaller rooms to make a larger room. However, this room already holds near fifty.
hole covered by phone number sticker, 226 hooked up
| | 3.43 | MND | 3011 | 72 | 2010-01-15 | 2010-01-15 | Lecture | Advanced Smart | 2010-01-15: Technology updated.
2012-02-03 GS: Defective TLP700 replaced out with new unit MAC 00-05-A6-08-41-CC | pic | 3.43 | ALP | 204 | 72 | 2012-04-10 | 2010-01-15 | Lecture | Advanced Smart | 2012-04-10: Replace old DVD/VCR player with a JVC DR-MV150B DVD/VCR.
2011-02-01: Need to remove cork board to complete renovation. Priority per Dean Varshney. VPs want to avoid major renovations in ALP because it's potentially slated for demo. | pic | 3.43 | DH | 110 | 49 | 2011-07-19 | | Lecture | Basic Smart | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2010-07-19: Technology updated
| pic | 3.42 | SQU | 443 | 40 | | | Lecture | See Equipment | 2013-04-23: VP’s would like to upgrade to an Intermediate level classroom which includes a podium with a controller, a laptop connection, PC, and zone lighting in the room
2012-01-20: Targeted for facilities and technology maintenance Summer 2012
2011-06-27: VPs postpone renovation plans due to budget limitation
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Third highest priority per Dean Lascher. Also prioritized by Dean Trainer- who requested a PC as well as laptop connection. | pic | 3.40 | AMD | 309 | 35 | 2011-11-21 | | Lecture | Basic Smart | 2012-06-20: Technology updated. Installed new Extron MTP UTAD laptop connection.
2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-10-22: Installed new Panasonic FW300 projector
2010-09-01: Several stained and broken ceiling panels, hole in the wall. Excess hook system. Exposed electrical box front of room. Front-left and center-left fluorescent ceiling lights out.
2011-02-01: Priority per Dean Trainer.
| pic | 3.39 | BRH | 110 | 54 | 2011-08-26 | | Lecture | Basic Smart | 2012-10-12: Technology updated. Installed new Extrom MTP UTAD and URA.
2012-06-07: Technology updated. Installed new Panasonic PT-FW300U projector.
2012-02-08: Request for laptop connection by Professor Sarah Strand
2010-09-01: Room needs paint, espcially by the controller. Front wall under corkboard id very dirty. Some of the floor trim is ripped missing near front left door corner. Doors need touch up paint.
2011-02-01: Priority per Dean Varshney. Double doors and layout are problematic.
needs bigger screen; some issues; possible target for podium, infocus | pic | 3.34 | MND | 2007 | 60 | 2010-01-15 | | Lab | Advanced Smart | 2010-01-15: Technology updated and podium added. | pic | 3.32 | BNC | 1029 | 44 | 2012-11-16 | 2005-09-01 | Lecture | Basic Smart | 2012-11-16: Technology updated with Extron UTAD laptop connection and 2 new Panasonic PT-FW430U projectors.
2010-11-18: Replaced dual controllers with single controller. | | 3.28 | AMD | 219 | 49 | 2012-01-03 | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance. | pic | 3.26 | FLS | 1063 | 125 | 2012-04-27 | 2011-01-24 | Lecture | Advanced Smart | 2012-04-27: Updated, installed podium mics.
2011-01-21: Technology updated in room. | pic | 3.24 | MND | 2003 | 54 | 2012-01-27 | | Lab | Basic Smart | 2012-01-27: VGA Switch was installed for laptop use
2011-02-01: PC lab, not used that often | pic | 3.24 | DH | 210 | 28 | 2011-03-09 | | Lecture | See Equipment | 2013-04-23: VPs would like to combine smaller rooms to make a larger room. also, they want room updated to an advanced smart classroom with full sized podium, controller, zone lighting, laptop connection, and pc in the room.
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Priority per Dean Tooker. VPs want to avoid major renovations in DH because it's potentially slated for demo. Room layout is too narrow.
Winter, not smart
2001-06-27: VPs postpone renovation plans due to budget limitation | pic | 3.23 | SQU | 456 | 75 | 2009-09-01 | 2009-09-01 | Lecture | Advanced Smart | 2009-09-01: Renovated facilities and technology. | | 3.23 | MND | 2009 | 48 | 2012-01-20 | | Lecture | Basic Smart | 2012-01-20: New Panasonic projector and laptop interface panel installed.
2010-10-29: Technology updated | | 3.22 | FLS | 1050 | 125 | 2012-04-27 | 2011-01-24 | Lecture | Advanced Smart | 2012-04-27: Updated, installed new podium mic.
2011-01-21: Technology updated in room. | pic | 3.20 | BRH | 218 | 49 | 2011-12-10 | | Lecture | Basic Smart | 2010-09-01: Remove TV mount, touch up paint near door at walls where desks hit. A couple lights out, but not entire panels.
2011-02-01: Need to upgrade more ALS rooms.
| pic | 3.18 | CLV | 145 | 65 | 2011-08-26 | | Lecture | Basic Smart | 2012-03-28: Anthropology faculty have request improvements, including a whiteboard.
2012-02-21: Space Management passed along a request for a whiteboard/chalkboard to be installed on the east wall of the lecture room.
2010-09-01: Lights out. One panel in first row, three panels in second row. Small tear in screen. Could be fixed with duct tape. Ceiling needs to be cleaned
2011-02-01: Layout is a little challenging. However, it's so wide that the space in front between the doors might work. | pic | 3.16 | ARC | 3009 | 48 | 2009-09-01 | 2005-09-01 | Lecture | Advanced Smart | 2009-09-01: Renovated facilities and technology. | pic | 3.16 | SQU | 301 | 120 | 2008-08-01 | 2008-08-01 | Lecture | Advanced Smart | 2008-08-01: Older style podium with 226 panel
2013-04-02: Replaced projector screen and document camera | pic | 3.15 | AMD | 150 | 122 | 2012-02-03 | 2011-08-15 | Lecture | Advanced Smart | 2012-02-03: Installed podium microphone
2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Temporary technology setup needs to be replaced. Largest room with outdated technology. Facilities work could be extensive.
old podium in place, 226 in place, don't wire projector | pic | 3.15 | ALP | 144 | 60 | 2011-11-21 | | Lecture | Basic Smart | 2010-09-01: Small damage to ceiling tile. Some water damage to a few ceiling tiles. The doors need refinishing.
2011-02-01: Double doors at front of room prevent decent layout without major renovations. Priority per Dean Baldini. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| pic | 3.14 | BRH | 104 | 55 | 2011-11-21 | | Lecture | Basic Smart | 2011-02-01: Priority per Dean Varshney. No existing controller makes adding new one difficult in short term.
Postpone for Podium. Tiny screen and infocus projector; possible target for podium; has CBA computer, | pic | 3.14 | AMD | 263 | 34 | 2012-01-03 | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2012-01-03: Installed a new Extron MLC-104 Controller and Extron MTP-UTAD Interface Panel
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-10-29: Installed new Panasonic FW300 projector.
| pic | 3.13 | MND | 1022 | 43 | 2010-08-01 | | Lecture | Basic Smart | 2010-08-01: Technology updated | pic | 3.13 | SLN | 2002 | 82 | 2012-03-09 | 2009-09-01 | Lecture | Advanced Smart | 2012-03-09: Installed podium microphone
2009-09-01: Renovated facilities and technology. | pic | 3.12 | KDM | 145 | 70 | 2012-07-30 | | Lecture | Advanced Smart | 2012-07-30: Technology updated. Added a new podium and the screen was replaced with a new Da Lite 34464LC 8ft. screen.
2012-01-30: Targeted for technology update and new podium Summer 2012
2012-01-27: Art department has expressed interest in getting the room updated. Room has no whiteboards, screen is barely working and threatening to get stuck in up or down position.
2013-04-02: Projector Screen Replaced | pic | 3.10 | MND | 2004 | 54 | | | Lab | Basic Smart | 2011-02-01: Lab, postpone
| pic | 3.08 | MND | 1026 | 34 | 2010-09-10 | | Lecture | Basic Smart | 2012-05-22: Installed new MTP UTAD controller.
2010-09-10: Epson projector, 226 in place, wired
2013-04-02: Projector screen replaced | pic | 3.07 | MND | 1020 | 43 | 2010-08-01 | | Lecture | Basic Smart | 2010-08-01: Technology updated | pic | 3.05 | BRH | 109 | 30 | | | Lecture | See Equipment | 2012-01-20: Targeted for facilities and technology maintenance Summer 2012
2001-06-27: VPs postpone renovation plans due to budget limitation
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Priority per Dean Trainer.
| pic | 3.03 | BRH | 204 | 45 | 2011-08-26 | | Lecture | Basic Smart | 2010-09-01: Touchup paint needed on door and areas on walls. Transparency cart needs to be cleaned. Lights are out. Some sort of wooden mount at front of room should be removed.
2011-02-01: Priority per Dean Varshney.
| pic | 3.03 | AMD | 314 | 40 | | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance. | pic | 3.03 | AMD | 252 | 40 | 2011-05-25 | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2010-09-01: Paint near MLC-104. Door needs paint. Back left wall as you face it needs paint.
| pic | 3.03 | FLS | 1049 | 80 | 2011-01-21 | 2011-01-24 | Lecture | Advanced Smart | 2011-01-21: Technology updated in room. | pic | 3.01 | SQU | 338 | 75 | 2009-09-01 | 2009-09-01 | Lecture | Advanced Smart | 2009-09-01: Renovated facilities and technology.
2013-04-02: Replaced projector | pic | 3.00 | MRP | 1014 | 49 | 2010-07-16 | | Lecture | Basic Smart | 2011-02-01: VPs would like to combine smaller rooms to make a larger room. However, this room already holds near fifty.
| | 3.00 | AMD | 260 | 40 | 2011-11-21 | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-11-21: Replaced InFocus Projector with Panasonic PT-FW300U Projector
2011-02-01: Recommended Ethnic Studies Chair Fong.
| pic | 2.99 | SQU | 316 | 75 | 2008-09-01 | 2008-09-01 | Lecture | Advanced Smart | 2008-09-01: Facilities and technology renovated | pic | 2.99 | AMD | 217 | 49 | 2012-01-03 | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2012-01-03 Installed Extron MLC-104 Controller
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
| pic | 2.99 | FLS | 1029 | 50 | 2011-01-21 | 2011-01-24 | Lab | Advanced Smart | 2012-05-12: Installed wired microphone in podium.
2011-01-21: Technology updated in room. | | 2.98 | ALP | 235 | 60 | 2011-01-21 | | Lecture | Basic Smart | 2011-01-21: Installed MTP-UTAD Interface Panel, Panasonic Projector
2011-02-01: Highest priority per Dean Lascher. Room is very long and narrow, making it not conducive to classroom design standards. Will take significant resources- move doors and windows. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
add new projector; will probably not be wired, since we've maxed out our number of rooms
| pic | 2.98 | ALP | 212 | 45 | 2012-06-06 | | Lecture | Basic Smart | 2012-06-06: Technology updated. Installed new Extron MLC 104 controller with Extron MTP-UTAD laptop connection and Panasonic PT-FW300U projector.
2010-09-01: Touch up paint where desks hit wall near entrance to room and on back wall as well. The door needs to be refinished - it is really dirty and worn. A few lights need replacing, but there are no entire panels out (just one bulb in a few panels.)
2011-02-01: Need to upgrade some SSIS rooms. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| pic | 2.97 | AMD | 153 | 122 | 2012-03-02 | 2011-08-15 | Lecture | Advanced Smart | 2012-03-02: Installed podium microphone
2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Largest room with outdated technology. Facilities work could be extensive. Priority per Dean Varshnay.
dual projectors beyond scope for this Summer; possible old podium | pic | 2.95 | LIB | 128 | 34 | | | Lecture | Basic Smart | 2011-02-01: Recommended Ethnic Studies Chair Fong.
hole in wall by 226
| | 2.94 | MND | 1024 | 37 | 2010-08-01 | | Lecture | Basic Smart | 2010-08-01: Updated panel. | pic | 2.94 | DH | 111 | 30 | | | Lecture | See Equipment | 2012-01-20: Targeted for facilities and technology maintenance Summer 2012
2001-06-27: VPs postpone renovation plans due to budget limitation
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Wait till Winter. Priority per Dean Tooker and recommended by space management.
| pic | 2.86 | ALP | 218 | 50 | 2011-12-03 | | Lecture | Basic Smart | 2011-02-01: Good layout and access to infrastructure. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| pic | 2.86 | EUR | 109 | 45 | 2011-08-15 | 2011-08-15 | Lecture | Advanced Smart | 2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Room has network infrastructure present, reducing costs. Also, few HHS classrooms have been upgraded recently outside of Nursing.
| pic | 2.85 | BRH | 208 | 65 | 2010-08-25 | | Lecture | Basic Smart | 2010-08-25: Technology updated, SP-Controller replaced with a 226 panel. | pic | 2.78 | RVR | 1006 | 37 | 2010-08-01 | | Lecture | Basic Smart | 2010-08-01: Hole in wall covered with plate. Projector replaced. | pic | 2.77 | MND | 4008 | 50 | 2011-08-15 | 2011-08-15 | Lecture | Advanced Smart | 2011-08-27: Room equipment and facilities renovated
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Professor Strasser has requested an upgrade.
room has 226
no VGA cable | pic | 2.77 | FLS | 1033 | 50 | 2011-01-21 | 2011-01-24 | Lab | Advanced Smart | 2011-01-21: Technology updated in room. | | 2.75 | FLS | 1051 | 40 | 2011-01-21 | 2011-01-24 | Lecture | Advanced Smart | 2011-01-21: Technology updated in room. | pic | 2.74 | DH | 212 | 86 | 2009-09-01 | 2009-09-01 | Lecture | Advanced Smart | 2009-09-01: Renovated facilities and technology. | pic | 2.74 | EUR | 112 | 49 | 2011-08-15 | 2011-08-15 | Lecture | Advanced Smart | 2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Room has network infrastructure present, reducing costs. Also, few ED classrooms have been upgraded recently.
| pic | 2.73 | MRP | 1016 | 39 | 2010-07-16 | | Lecture | Basic Smart | 2010-07-16: Technology updated in room. | | 2.73 | TAH | 1025 | 55 | 2010-08-01 | | Lecture | Basic Smart | 2010-08-01: Technology updated in room. | | 2.73 | EUR | 101 | 40 | 2012-02-17 | | Lecture | Basic Smart | 2012-02-17: Installed MTP-UTAD laptop interface panel | pic | 2.71 | LIB | 65 | 48 | 2009-09-01 | 2009-09-01 | Lecture | Advanced Smart | 2012-07-25: Updated with a smaller mid-size podium and installed new Wolfvision EYE-12 ceiling document camera.
2009-09-01: Renovated facilities and technology. | pic | 2.69 | RVR | 1012 | 37 | 2010-08-01 | | Lecture | Basic Smart | 2012-07-30: Replaced ripped screen and Inline 3260 laptop connection.
2010-08-01: Technology updated | pic | 2.69 | YSM | 127 | 60 | 2011-08-15 | 2011-08-15 | Lecture | Advanced Smart | 2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Priority per Dean Baldini.
| pic | 2.68 | HMB | 202 | 60 | 2011-08-15 | 2011-08-15 | Lecture | Advanced Smart | 2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Priority per Dean Trainer. WEt table at front, pendant lights, and chalk boards increase costs of intermediate upgrade.
| pic | 2.65 | ALP | 236 | 60 | 2010-01-15 | 2010-01-15 | Lecture | Advanced Smart | 2011-02-01: Priority per Dean Varshney. Already completed last year. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
2010-08-01: Technology updated and podium added | pic | 2.65 | MND | 4007 | 26 | | | Lecture | See Equipment | 2012-01-20: Targeted for facilities and technology maintenance Summer 2012
2011-02-01: Recommended by space management.
| pic | 2.64 | EUR | 111 | 49 | 2011-08-26 | | Lecture | Basic Smart | 2011-02-01: Room has network infrastructure present, reducing costs. Also, few ED classrooms have been upgraded recently.
| pic | 2.60 | DH | 213 | 49 | 2012-04-06 | 2011-08-15 | Lecture | Advanced Smart | 2012-04-06: Replaced the DVD/VCR player with a new Toshiba DVR620 DVD/VCR.
2011-08-27: Technology and facilities renovated
2001-06-27: VPs approve renovation plans
2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Second priority per Dean Lascher; excellent layout for for design.
needs new OVP, no CATV | pic | 2.59 | MND | 2032 | 29 | 2011-07-18 | | Lecture | Basic Smart | 2010-007-18: Technology updated
2010-09-01: Broken/sagging ceiling tile front center of room. Hole in drywall behind door. Paint needed. | pic | 2.59 | AMD | 250 | 40 | 2011-11-21 | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-12-22 Replaced SP Controller with Extron MLC-104 Controller
| pic | 2.57 | BRH | 214 | 50 | 2012-04-06 | | Lecture | Basic Smart | 2012-04-06: Replaced old Panasonic DVD/VCR player with a new Toshiba DVR620 DVD/VCR player.
2012-01-05: Updated technology in room. replaced Infocus projector with Panasonic projector, replaced panel and added new laptop interface devices. | pic | 2.55 | MND | 2008 | 35 | 2012-01-27 | | Lab | Basic Smart | 2012-01-27: VGA switch installed for laptop use
2012-01-13: PC Lab no need to update technology. | pic | 2.54 | ALP | 138 | 49 | 2011-07-19 | | Lecture | Basic Smart | 2011-09-01: Floor trim at back right hand corner of room is missing from the wall
2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| pic | 2.54 | AMD | 240 | 40 | 2012-01-03 | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2012-01-03 Installed Extron MLC-104 Controller
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance. | pic | 2.52 | RVR | 2010 | 32 | 2010-08-01 | | Lecture | Basic Smart | 2010-08-01: Technology updated | | 2.52 | AMD | 262 | 37 | 2012-01-04 | | Lecture | Basic Smart | 2012-01-20: Targeted for technology and facilities maintenance in Summer 2012.
2011-01-04: Installed a new MTP-UTAD Interface Panel
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
2011-11-05: Installed new Panasonic projector.
2011-02-01: Requested by ETHN Chair Fong. Wants a built in PC.
| pic | 2.51 | TAH | 1007 | 73 | 2011-08-26 | | Lecture | Basic Smart | 2012-06-25: Technology updated. Installed new Panasonic PT-FW430U projector.
2011-08-26: Technology updated in room. Replaced panel with MLC 104. | | 2.50 | RVR | 1010 | 37 | 2010-08-01 | | Lecture | Basic Smart | 2010-08-01: Technology updated in room. | pic | 2.50 | LIB | 4021 | 40 | 2012-01-03 | | Lecture | Basic Smart | 2012-01-03: | | 2.49 | BRH | 114 | 55 | 2012-03-09 | | Lecture | Advanced Smart | 2012-03-09: Replaced old projector with a new Panasonic PT-FW300U Projector.
2010-07-15: Technology updated in room. | pic | 2.48 | BRH | 202 | 65 | 2011-04-06 | | Lecture | Basic Smart | 2012-06-08: Technology updated. Installed new Panasonic PT-FW300U projector.
2011-04-06: Updated Infocus projector
| pic | 2.48 | MND | 1030 | 30 | 2012-05-22 | | Lecture | Basic Smart | 2012-05-22: Technology updated: Installed new Panasonic PT-FW300U projector and MTP UTAD controller.
2011-07-19: Technology updated in room. | pic | 2.46 | TAH | 1004 | 45 | 2011-01-24 | 2011-01-24 | Lecture | Advanced Smart | 2011-01-24: Wired 226 in wall for now; possible podium room, though it depends on connections between podium and projector. | pic | 2.46 | ALP | 227 | 35 | | | Lecture | See Equipment | 2011-02-01: Recommended by space management. Very loud AC. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| pic | 2.45 | CLV | 123 | 54 | 2011-07-19 | | Lecture | Basic Smart | 2011-02-01: long narrow room. Would take a lot to get it function- dual display system or facilities work.
right projector may need new bulb | | 2.44 | RVR | 1004 | 37 | 2010-08-01 | | Lecture | Basic Smart | 2010-08-01: Technology updated | pic | 2.44 | RVR | 1002 | 37 | 2010-08-01 | | Lecture | Basic Smart | 2010-08-01: Technology updated in room. | pic | 2.44 | YSM | 119 | 48 | | | Lecture | Basic Smart | | pic | 2.43 | MRP | 2030 | 40 | 2013-04-02 | | Lecture | Basic Smart | 2013-04-02: Update classroom technology - projector, interface panel and fixed legacy wiring issue to speakers. Projector screen replaced | | 2.43 | EUR | 104 | 51 | 2012-01-05 | | Lecture | Basic Smart | 2012-01-05: Updated technology in room. Replaced Infocus projector with Panasonic projector, added new laptop interface devices. | | 2.43 | FLS | 1048 | 40 | 2011-01-21 | 2011-01-24 | Lab | Advanced Smart | 2011-01-21: Technology updated in room. | | 2.42 | DH | 107 | 43 | 2012-05-31 | | Lecture | Basic Smart | 2012-05-30: Technology updated. Installed Extron MTP UTAD laptop connection and new Panasonic PT-FW300U Projector.
2010-07-19: Technology updated
2010-09-01: Lights out - first row two panels, Holes in the wall need to be fixed where mount was removed | pic | 2.41 | DH | 105 | 49 | 2011-07-19 | | Lecture | Basic Smart | 2012-06-05: Technology updated. Installed Panasonic PT-FW300U projector.
2011-07-19: Technology updated
2013-04-02: Projector screen replaced | pic | 2.40 | LIB | 127 | 34 | 2012-02-03 | | Lecture | Basic Smart | 2012-02-03: Installed new laptop interface panel - Extron MTP-UTAD
2012-01-13: Suggested updates, wall by 226 needs paint
| pic | 2.40 | ALP | 232 | 55 | 2011-07-19 | | Lecture | Basic Smart | 2012-06-06: Technology updated. Installed new Panasonic PT-FW300U projector.
2010-09-01: Doors need refinishing, Touch up paint near door at bottom edge of wall... looks like something splashed.
2011-02-01: VPs do not want to renovate ALP because it's potentially slated for demo.
Equipment Picture missing | pic | 2.40 | EUR | 106 | 49 | 2013-04-02 | | Lecture | Basic Smart | 2011-11-21: Technology updated in room.
2013-04-02: Replaced interface controller with UTAD/URA interface | | 2.39 | EUR | 103 | 35 | 2011-12-03 | | Lecture | Basic Smart | 2011-12-03: Technology updated in room. | | 2.38 | RVR | 1008 | 37 | 2010-08-01 | | Lecture | Basic Smart | 2010-08-01: Technology updated in room. | pic | 2.38 | DH | 106 | 40 | 2011-08-15 | 2011-08-15 | Lecture | Advanced Smart | 2011-02-01: Priority per Dean Tooker. Combined into single room.
| pic | 2.37 | DH | 108 | 45 | 2012-06-05 | | Lecture | Basic Smart | 2012-06-05: Technology updated. Installed new Extron MLC 104 controller with Extron MTP UTAD laptop connection and Panasonic PT-FW300U projector. | pic | 2.36 | ALP | 147 | 25 | 2012-02-03 | | Lecture | See Equipment | 2012-02-03: Installed overhead transparency projector
2011-02-01: Recommended by space management. Very loud AC is disruptive. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
Not a Smart Classroom | pic | 2.35 | SLN | 2003 | 30 | 2011-05-25 | | Lab | Basic Smart | 2011-02-01: Computer lab - postponed for renovation.
| | 2.33 | SLN | 2004 | 40 | 2012-01-03 | | Lecture | Basic Smart | | pic | 2.33 | ALP | 148 | 45 | 2012-06-12 | | Lecture | Basic Smart | 2012-06-12: Technology updated. Installed Extron MLC 104 controller with Extron MTP UTAD laptop connection and Panasonic PT-FW300U projector.
2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| pic | 2.32 | BRH | 203 | 31 | 2011-03-09 | | Lecture | See Equipment | 2011-03-09: LSAW recommends room for Summer renovation
2011-02-01: Recommended by space management.
Not a Smart Classroom
2001-06-27: VPs postpone renovation plans due to budget limitation. | pic | 2.31 | MND | 4005 | 20 | 2012-01-13 | | Lecture | See Equipment | 2012-01-13: This is a conference Room and has just one Transparency Projector | | 2.30 | YSM | 135 | 49 | 2011-07-19 | | Lecture | Basic Smart | 2010-09-01: Touch up paint at front of room by raceway above controller and under front window. TV mount should be removed, but facilities will have to fill holes and paint. Does the old projector booth need to be in there? Flourescent light bulbs broken in front center and back right areas of classroom.
2010-09-01: Touch up paint at front of room by raceway above controller and under front window. TV mount should be removed. Does the old projector booth need to be in there? Flourescent light bulbs broken in front center and back right areas of classroom.
| pic | 2.30 | EUR | 113 | 45 | 2011-08-05 | | Lecture | Basic Smart | 2012-08-13: Replaced Infocus with a new Panasonic PT-FW300U projector.
2011-08-05: Technology updated in room. | | 2.29 | SLN | 2000 | 40 | 2011-07-19 | | Lecture | Basic Smart | 2012-05-30: Technology updated. Replaced Infocus projector with a new Panasonic PT-FW300U projector.
2011-07-19: Hole covered in wall with sticker.
| | 2.29 | CLV | 134 | 38 | 2013-04-02 | | Lecture | See Equipment | 2013-04-02: Updated classroom technology - projector, controller, interface
| pic | 2.28 | SQU | 128 | 30 | 2011-07-19 | | Lecture | Basic Smart | 2010-09-01: Room needs paint, can the metal and board thing above the controller be removed? (Facilities would need to paint and fill holes). Holes in wall under DVD player need to be filled (large holes 4 of them) 2 broken ceiling tiles.
2013-04-02: Replaced projector | pic | 2.28 | DH | 206 | 49 | 2012-05-29 | | Lecture | Basic Smart | 2012-05-29: Technology updated. Installed Extron MLC 104 controller with MTP UTAD laptop connection and new Panasonic PT-FW300U Projector. | pic | 2.27 | LIB | 126 | 35 | 2012-10-26 | | Lecture | Basic Smart | 2012-10-26: Technology updated with Extron MLC 104 controller and MTP UTAD laptop connection.
2011-07-19: Technology updated in room. | pic | 2.26 | MND | 1028 | 24 | | | Lecture | See Equipment | 2012-01-20: Targeted for facilities and technology maintenance Summer 2012
2011-02-01: Recommended by space management.
| pic | 2.24 | SQU | 325 | 35 | | | Lecture | Basic Smart | | pic | 2.24 | SQU | 122 | 32 | | | Lecture | Basic Smart | | pic | 2.20 | CLV | 141 | 45 | 2012-08-16 | | Lecture | Basic Smart | 2012-08-16: Technology updated. Installed new Extron MLC 104 controller, Extron MTP UTAD laptop connection, and Panasonic PT-FW300U projector. | | 2.19 | AMD | 261 | 30 | | | Lecture | See Equipment | 2011-02-01: Recommended by Space management
2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance.
| pic | 2.18 | DH | 207 | 40 | 2012-05-29 | | Lecture | Basic Smart | 2012-05-29: Technology updated. Installed Extron MLC 104 controller with MTP UTAD laptop connection and new Panasonic PT-FW300U Projector. | pic | 2.17 | EUR | 107 | 55 | 2011-08-26 | | Lecture | Basic Smart | 2011-08-26: Technology updated in room. | | 2.12 | CLV | 135 | 38 | 2012-01-03 | | Lecture | Basic Smart |
| | 2.11 | YSM | 117 | 28 | 2011-02-01 | | Lecture | See Equipment | 2011-02-01: Recommended by space management.
| pic | 2.10 | ALP | 153 | 38 | 2011-11-21 | | Lecture | Basic Smart | 2012-06-15: Technology updated. Installed new Panasonic PT-FW430U Projector.
2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| pic | 2.10 | EUR | 114 | 40 | 2012-01-05 | | Lecture | Basic Smart | 2012-01-05: Updated technology in room. Replaced Infocus projector with Panasonic projector, added new laptop interface devices, speakers and AMP. | | 2.08 | SQU | 142 | 30 | 2011-02-01 | | Lecture | See Equipment | 2011-02-01: Recommended by space management.
| | 2.08 | EUR | 115 | 45 | | | Lecture | Basic Smart |
| | 2.07 | SLN | 2001 | 30 | | | Lab | Basic Smart |
| | 2.05 | TAH | 1002 | 31 | 2012-02-17 | | Lecture | Basic Smart | 2012-02-17: Installed Panasonic PT-FW300U Projector and MLC-104 Controller
2012-02-03 Installed speakers | pic | 2.01 | EUR | 315 | 35 | 2013-04-02 | | Lecture | Basic Smart | 2013-04-02: Updated classroom technology - projector, controller, interface | | 1.94 | SHS | 143 | 32 | 2011-09-17 | | Lecture | Basic Smart | 2011-09-17: Technology updated in room. | pic | 1.93 | CPS | 327 | 40 | | | Lecture | See Equipment |
| | 1.91 | TAH | 1027 | 32 | 2010-10-01 | | Lecture | Basic Smart | 2012-06-27: Technology updated. Installed new Panasonic PT-FW430U projector.
2010-10-01: Room now has MLC 104 controller. | pic | 1.91 | DH | 214 | 34 | 2012-05-24 | | Lecture | Basic Smart | 2012-05-24: Technology updated. Installed Extron MLC 104 controller with MTP UTAD laptop connection and new Panasonic PT-FW300U Projector. | pic | 1.90 | DH | 208 | 40 | 2012-05-30 | | Lecture | Basic Smart | 2012-05-30: Technology updated. Installed Extron MTP UTAD laptop connection and new Panasonic PT-FW300U Projector.
2011-08-26: Technology updated | pic | 1.89 | SQU | 450 | 25 | 2012-04-14 | | Lecture | Basic Smart | 2012-04-14: Updated technology. Replace old SP Control with a new MLC 104 controller. | pic | 1.88 | SHS | 264 | 30 | | | Lecture | See Equipment | 2011-02-01: Recommended by space management.
| | 1.85 | MND | 1032 | 20 | | | Lecture | See Equipment |
| | 1.83 | BRH | 101 | 35 | 2012-06-27 | | Lecture | Basic Smart | 2012-06-27: Technology updated. Installed new Extron MLC 104 controller with Extron MTP UTAD laptop connection and a Panasonic PT-FW430U projector. | pic | 1.83 | SHS | 254 | 27 | | | Lecture | See Equipment | 2011-02-01: Recommended by space management.
| | 1.80 | YSM | 133 | 30 | 2012-06-19 | | Lecture | Basic Smart | 2012-06-19: Technology updated. Installed Extron MLC 104 controller with an Extron MTP UTAD laptop connection and a Panasonic PT-FW430U Projector. | pic | 1.78 | YSM | 141 | 36 | 2012-06-20 | | Lecture | Basic Smart | 2012-06-20: Technology updated. Installed Extron MLC 104 controller with an Extron MTP UTAD laptop connection and a Panasonic PT-FW430U Projector. | pic | 1.73 | MND | 3007 | 22 | | | Lecture | See Equipment |
| | 1.70 | AMD | 362 | 15 | | | Lecture | See Equipment | 2011-12-15: AMD hall targeted for coordinated IRT/Facilities maintenance. | | 1.69 | EUR | 102 | 40 | 2013-04-02 | | Lecture | Basic Smart | 2013-04-02: Updated classroom technology - projector, controller, interface | | 1.68 | SHS | 250 | 35 | 2012-06-18 | | Lecture | Basic Smart | 2012-06-18: Technology updated. Installed Extron MLC 104 controller with an Extron MTP UTAD laptop connection and a Panasonic PT-FW430U Projector. | | 1.65 | DH | 109 | 33 | 2012-05-24 | | Lecture | Basic Smart | 2012-05-24: Technology updated. Installed Extron MLC 104 controller with MTP UTAD laptop connection and new Panasonic PT-FW300U Projector. | | 1.63 | BRH | 201 | 32 | | | Lecture | See Equipment | | pic | 1.60 | BRH | 115 | 30 | | | Lecture | See Equipment | | pic | 1.60 | LSN | 2300 | 28 | | | Lecture | See Equipment | | pic | 1.57 | SQU | 102 | 26 | | | Lecture | See Equipment |
| | 1.56 | EUR | 215 | 40 | 2012-03-21 | | Lab | Basic Smart | 2012-03-21: Updated new technology in the room. Installed new MTP-UTAD interface panel, MLC-104 controller, and Panasonic PT-FW300U projector.
2011-12-14: Priority per meeting between Sue Collins and La Tina Gago, Steve ODonnell, and Katy Romo. They would like the technology refresh to include a MLC-104 controller, MTP-UTAD Interface, and Panasonic projector. They are hopeful to have the Dean's approval to move forward with the refresh in January before classes resume.
2011-02-01: Priority per Dean Sheared. | | 1.50 | BRH | 105 | 32 | | | Lecture | See Equipment | | pic | 1.47 | BRH | 209 | 30 | | | Lecture | See Equipment |
| | 1.47 | ALP | 231 | 30 | | | Lecture | See Equipment | 2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| pic | 1.47 | SHS | 145 | 30 | 2012-06-15 | | Lecture | Basic Smart | 2012-06-15: Technology updated. Installed Extron MLC 104 controller with an Extron MTP UTAD laptop connection and a Panasonic PT-FW430U Projector. | pic | 1.47 | SLN | 4008 | 20 | | | Lecture | See Equipment | | pic | 1.47 | EUR | 211 | 35 | 2012-03-22 | | Lab | Basic Smart | 2012-03-22: Updated new technology in the room. Installed new MTP-UTAD interface panel and MLC-104 controller.
2012-01-20: Installed Panasonic projector.
2011-12-14: Priority per meeting between Sue Collins and La Tina Gago, Steve ODonnell, and Katy Romo. They would like the technology refresh to include a MLC-104 controller, MTP-UTAD Interface, and Panasonic projector. They are hopeful to have the Dean's approval to move forward with the refresh in January before classes resume.
2011-02-01: Priority per Dean Sheared. | | 1.43 | BRH | 113 | 27 | | | Lecture | See Equipment | | pic | 1.43 | SLN | 3008 | 18 | | | Lecture | See Equipment |
| | 1.38 | CPS | 143 | 190 | | | Lab | See Equipment |
| | 1.38 | CPS | 151 | 190 | | | Lab | See Equipment |
| | 1.38 | EUR | 223 | 40 | 2013-04-02 | 2013-04-02 | Lab | Basic Smart | 2011-02-01: Priority per Dean Sheared.
2013-04-02: Updated classroom technology - projector, controller, interface, speakers, screen, whiteboards
| | 1.38 | CPS | 142 | 338 | | | Lab | See Equipment |
| | 1.35 | SHS | 101 | 150 | | | Lab | See Equipment | ALS; THEA Department
This is a theater. | | 1.34 | EUR | 329 | 30 | 2013-04-02 | 2013-04-02 | Lab | See Equipment | 2011-02-01: Priority per Dean Sheared.
2013-04-02: Updated classroom technology - projector, controller, interface, speakers, screen, whiteboards
| | 1.33 | MRP | 2000 | 30 | | | Lab | Basic Smart |
| | 1.32 | ALP | 205 | 20 | | | Lecture | See Equipment | 2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| | 1.29 | EUR | 309 | 25 | | | Lecture | See Equipment |
| | 1.28 | MND | 4011 | 24 | 2012-01-03 | | Lab | Basic Smart |
| | 1.27 | MRP | 2005 | 35 | | | Lab | See Equipment | 2012-01-20: This is the back door of the classroom 2003
they are the same | | 1.26 | MND | 3002 | 25 | | | Lab | See Equipment |
| | 1.25 | MND | 3006 | 24 | | | Lab | See Equipment |
| | 1.24 | EUR | 301 | 31 | 2012-03-20 | | Lab | Basic Smart | 2012-03-20: Updated new technology in the room. Installed new MTP-UTAD interface panel, MLC-104 controller, and Panasonic PT-FW300U projector.
2011-12-14: Priority per meeting between Sue Collins and La Tina Gago, Steve ODonnell, and Katy Romo. They would like the technology refresh to include a MLC-104 controller, MTP-UTAD Interface, and Panasonic projector. They have Dean's approval to move forward with the refresh over Spring Break. | | 1.23 | EUR | 415 | 30 | 2012-01-03 | | Lab | Basic Smart | 2011-02-01: Priority per Dean Sheared.
| | 1.22 | ARC | 1013 | 40 | | 2005-09-01 | Lab | Basic Smart |
| | 1.22 | EUR | 413 | 20 | | | Lecture | See Equipment |
| | 1.19 | MND | 3003 | 28 | | | Lab | See Equipment |
| | 1.18 | CPS | 223 | 45 | | | Lab | See Equipment |
| | 1.18 | CPS | 227 | 45 | | | Lab | Basic Smart |
| | 1.16 | MRP | 2002 | 25 | | | Lab | See Equipment |
| | 1.15 | CPS | 205 | 40 | | | Lab | See Equipment |
| | 1.15 | CPS | 209 | 40 | | | Lab | See Equipment |
| | 1.12 | ALP | 224 | 53 | | | Lab | See Equipment | 2011-02-01: Priority per Dean Varshney. VPs want to avoid major renovations in ALP because it's potentially slated for demo.
their fob doesn't work
Equipment Picture is missing | | 1.12 | MRP | 1009 | 22 | | | Lab | Basic Smart |
| | 1.11 | MRP | 1003 | 21 | | | Lab | Basic Smart |
| | 1.10 | MRP | 1011 | 30 | | | Lab | Basic Smart |
| | 1.10 | MRP | 1007 | 20 | | | Lab | Basic Smart |
| | 1.10 | MRP | 1005 | 20 | | | Lab | Basic Smart |
| | 1.10 | MND | 2002 | 20 | | | Lab | See Equipment |
| | 1.07 | MRP | 4000 | 18 | | | Lab | See Equipment |
| | 1.06 | MRP | 3030 | 36 | | | Lab | Basic Smart |
| | 1.06 | SQU | 428 | 24 | | | Lab | See Equipment | 2011-02-01: Dean Trainer has requested that this room be made Smart and given it a high priority.
| | 1.05 | SLN | 1010 | 30 | | | Lab | See Equipment | ALS; THEA Department
Dance Studio | | 1.05 | LSN | 2107 | 30 | | | Lab | See Equipment | | | 1.05 | CPS | 321 | 30 | | | Lab | See Equipment |
| | 1.05 | LIB | 58 | 30 | | | Lab | See Equipment | | | 1.04 | LSN | 2103 | 16 | | | Lab | See Equipment | | | 1.04 | FLS | 1016 | 40 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 1.03 | MRP | 2001 | 15 | | | Lab | See Equipment |
| | 1.03 | MRP | 2007 | 15 | | | Lab | See Equipment |
| | 1.01 | MRP | 3001 | 30 | | | Lab | Basic Smart |
| | 1.01 | LSN | 2110 | 26 | | | Lab | See Equipment | | | 1.00 | AMD | 313 | 18 | | | Lab | Basic Smart | 2012-02-17: Department Chair requested that projector be replaced. | | 0.99 | KDM | 280 | 35 | | | Lab | Basic Smart | | | 0.99 | SQU | 446 | 18 | | | Lab | See Equipment | 2011-02-01: Priority per Dean Trainer.
| | 0.97 | LSN | 2104 | 22 | | | Lab | See Equipment | | | 0.95 | SQU | 452 | 40 | | | Lab | Basic Smart |
| | 0.95 | CLV | 131 | 30 | | | Lab | See Equipment |
| | 0.95 | SHS | 132 | 30 | | | Lab | See Equipment | ALS; THEA Department
Dance Space
| | 0.95 | KDM | 166 | 30 | | | Lab | Basic Smart | | | 0.95 | MRP | 3007 | 24 | | | Lab | Basic Smart |
| | 0.93 | LSN | 2200 | 18 | | | Lab | See Equipment | | | 0.92 | ARC | 1015 | 40 | | 2005-09-01 | Lab | Basic Smart |
| | 0.92 | KDM | 266 | 26 | | | Lab | See Equipment | | | 0.91 | MRP | 1013 | 25 | | | Lab | Basic Smart |
| | 0.91 | PLR | 1013 | 24 | | | Lab | Basic Smart |
| | 0.91 | SLN | 3018 | 15 | | | Lab | Basic Smart |
| | 0.91 | CPS | 319 | 16 | | | Lab | See Equipment |
| | 0.91 | CPS | 309 | 16 | | | Lab | See Equipment |
| | 0.91 | CPS | 311 | 16 | | | Lab | See Equipment |
| | 0.91 | KDM | 107 | 25 | | | Lab | See Equipment |
| | 0.91 | MND | 1014 | 20 | | | Lab | See Equipment | ANTH; SSIS Department
Archaeology Teaching Lab | | 0.90 | MRP | 5002 | 24 | | | Lab | See Equipment |
| | 0.90 | KDM | 264 | 24 | | | Lab | See Equipment | | | 0.90 | KDM | 170 | 24 | | | Lab | See Equipment | | | 0.90 | KDM | 113 | 24 | | | Lab | See Equipment | | | 0.90 | KDM | 101 | 24 | | | Lab | See Equipment |
| | 0.89 | ARC | 1014 | 36 | | 2005-09-01 | Lab | Basic Smart |
| | 0.89 | CPS | 301 | 15 | | | Lab | See Equipment |
| | 0.88 | LSN | 2105 | 14 | | | Lab | See Equipment | | | 0.87 | LSN | 2106 | 13 | | | Lab | See Equipment | There is only a transparency projector in this room and no other equipment. | | 0.86 | KDM | 160 | 20 | | | Lab | See Equipment | | | 0.86 | SHS | 249 | 20 | | | Lab | See Equipment | ALS; THEA Department
Action Lab | | 0.86 | ASL | 106 | 20 | | | Lab | See Equipment | No Equipment | | 0.86 | ASL | 108 | 20 | | | Lab | See Equipment |
| | 0.86 | ASL | 110 | 20 | | | Lab | See Equipment |
No Equipment | | 0.86 | KDM | 104 | 20 | | | Lab | See Equipment |
| | 0.86 | KDM | 131 | 20 | | | Lab | See Equipment |
| | 0.86 | MND | 1010 | 16 | | | Lab | See Equipment | ANTH; SSIS Department
Archaeology Lab
| | 0.86 | FLS | 1047 | 20 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 0.86 | FLS | 1013 | 20 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 0.86 | FLS | 1017 | 20 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 0.86 | FLS | 1018 | 20 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 0.86 | FLS | 1019 | 20 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 0.86 | FLS | 1020 | 20 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 0.84 | CPS | 303 | 10 | | | Lab | See Equipment |
| | 0.84 | CPS | 329 | 10 | | | Lab | See Equipment |
| | 0.83 | PLR | 1002 | 24 | | | Lab | Basic Smart |
| | 0.83 | PLR | 1006 | 24 | | | Lab | Basic Smart |
| | 0.82 | SHS | 219 | 16 | | | Lab | See Equipment |
| | 0.81 | TAH | 1009 | 30 | | | Lab | Basic Smart |
| | 0.81 | SHS | 300 | 15 | | | Lab | See Equipment |
| | 0.79 | SQU | 218 | 24 | | | Lab | See Equipment | | | 0.79 | SQU | 326 | 24 | | | Lab | Basic Smart | | pic | 0.79 | MND | 1012 | 9 | | | Lab | See Equipment | ANTH; SSIS Department
Archaeology Workroom
| | 0.79 | MND | 4009 | 9 | | | Lab | See Equipment |
| | 0.78 | EUR | 313 | 35 | | | Lab | Basic Smart |
| | 0.77 | YSM | 194 | 33 | | | Lab | Basic Smart |
| | 0.76 | SQU | 104 | 30 | | | Lab | See Equipment | | | 0.76 | SQU | 222 | 30 | | | Lab | Basic Smart | | | 0.76 | ALP | 152 | 31 | | | Lab | Basic Smart | 2011-02-01: VPs want to avoid major renovations in ALP because it's potentially slated for demo.
| | 0.76 | SLN | 3001 | 21 | | | Lab | Basic Smart |
| | 0.76 | AMD | 220 | 35 | | | Lab | Basic Smart |
| | 0.75 | BRH | 205 | 40 | | | Lab | See Equipment | | | 0.75 | SLN | 3003 | 20 | | | Lab | See Equipment |
| | 0.74 | FLS | 1034 | 8 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 0.74 | FLS | 1032 | 8 | 2011-01-21 | 2011-01-24 | Lab | See Equipment |
| | 0.74 | FLS | 1031 | 8 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 0.74 | FLS | 1028 | 8 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 0.74 | FLS | 1030 | 8 | 2011-01-21 | 2011-01-24 | Lab | Basic Smart |
| | 0.72 | SQU | 132 | 24 | | | Lab | See Equipment |
| | 0.72 | SQU | 232 | 24 | | | Lab | See Equipment | | | 0.72 | SQU | 236 | 24 | | | Lab | See Equipment | | | 0.72 | SQU | 242 | 24 | | | Lab | See Equipment |
| | 0.72 | SQU | 246 | 24 | | | Lab | See Equipment | | | 0.72 | SQU | 328 | 24 | | | Lab | See Equipment | | | 0.72 | SQU | 416 | 24 | | | Lab | Basic Smart |
| | 0.72 | SQU | 418 | 24 | | | Lab | Basic Smart |
| | 0.72 | SQU | 444 | 24 | | | Lab | See Equipment |
| | 0.72 | SQU | 538 | 24 | | | Lab | See Equipment |
| | 0.72 | SQU | 208 | 24 | | | Lab | See Equipment | | | 0.72 | SQU | 110 | 24 | | | Lab | See Equipment | | | 0.72 | SQU | 118 | 24 | | | Lab | See Equipment | | | 0.72 | PLR | 1003 | 12 | | | Lab | See Equipment | GEOL; NSM Lab | | 0.72 | PLR | 1101 | 12 | | | Lab | See Equipment | GEOL; NSM Lab | | 0.71 | YSM | 193 | 25 | | | Lab | See Equipment |
| | 0.70 | RVR | 5029 | 37 | | | Lab | Basic Smart |
| | 0.70 | SLN | 1030 | 15 | | | Lab | See Equipment |
| | 0.70 | SLN | 2022 | 15 | | | Lab | See Equipment |
| | 0.70 | SLN | 4015 | 15 | | | Lab | See Equipment |
| | 0.70 | SLN | 3016 | 15 | | | Lab | See Equipment |
| | 0.70 | EUR | 307 | 35 | | | Lab | Basic Smart |
| | 0.70 | AMD | 209 | 14 | | | Lab | See Equipment |
| | 0.69 | RVR | 1013 | 35 | | | Lab | Basic Smart |
| | 0.69 | HMB | 116 | 30 | | | Lab | See Equipment | | | 0.69 | SQU | 216 | 20 | | | Lab | See Equipment | | | 0.67 | RVR | 4003 | 32 | | | Lab | Basic Smart | CE; ECS Department
Construction Management Lab | | 0.66 | RVR | 2013 | 30 | | | Lab | See Equipment |
| | 0.66 | SQU | 212 | 16 | | | Lab | See Equipment | | | 0.65 | HMB | 210 | 24 | | | Lab | See Equipment |
| | 0.65 | HMB | 110 | 24 | | | Lab | See Equipment |
| | 0.65 | HMB | 216 | 24 | | | Lab | See Equipment | This room is lab. There is no equipment. | | 0.65 | HMB | 102 | 24 | | | Lab | See Equipment |
| | 0.65 | HMB | 124 | 24 | | | Lab | See Equipment |
| | 0.65 | SQU | 548 | 15 | | | Lab | See Equipment |
| | 0.65 | SQU | 550 | 15 | | | Lab | See Equipment |
| | 0.62 | SQU | 140 | 12 | | | Lab | See Equipment | | | 0.62 | SQU | 516 | 12 | | | Lab | See Equipment |
| | 0.62 | AMD | 124 | 16 | | | Lab | See Equipment |
| | 0.62 | SQU | 520 | 12 | | | Lab | See Equipment |
| | 0.62 | SQU | 522 | 12 | | | Lab | See Equipment |
| | 0.61 | AMD | 207 | 14 | | | Lab | See Equipment |
| | 0.60 | SQU | 130 | 9 | | | Lab | See Equipment | | | 0.59 | SQU | 540 | 8 | | | Lab | See Equipment |
Booked all weeks until 08/09 | | 0.59 | HMB | 221 | 16 | | | Lab | See Equipment |
| | 0.59 | HMB | 220 | 16 | | | Lab | See Equipment |
| | 0.59 | HMB | 207 | 16 | | | Lab | See Equipment |
| | 0.59 | RVR | 2001 | 20 | | | Lab | See Equipment | CSC; ECS Department
Computer Science System Lab
| | 0.59 | RVR | 2003 | 20 | | | Lab | See Equipment | CSC; ECS Department
CSC Grad Lab | | 0.59 | RVR | 2009 | 19 | | | Lab | See Equipment | CSC; ECS Department
Networks Lab | | 0.58 | SCL | 1208 | 32 | | | Lab | Basic Smart |
| | 0.58 | RVR | 2005 | 18 | | | Lab | See Equipment | CSC; ECS Department
Networks Lab | | 0.57 | SCL | 1218 | 30 | | | Lab | Basic Smart |
| | 0.57 | RVR | 3009 | 17 | | | Lab | See Equipment |
| | 0.56 | RVR | 1001 | 15 | | | Lab | See Equipment | Inside of 1007 which is a Advanced Instrumentation Lab.
| | 0.56 | RVR | 3005 | 15 | | | Lab | Basic Smart |
| | 0.56 | RVR | 3015 | 15 | | | Lab | See Equipment |
| | 0.56 | YSM | 190 | 6 | | | Lab | See Equipment | | | 0.56 | RVR | 3022 | 15 | | | Lab | See Equipment | ECS; EEE Department
Computer Engineering Senior Project Lab
| | 0.55 | RVR | 3001 | 13 | | | Lab | See Equipment |
| | 0.54 | RVR | 1003 | 12 | | | Lab | See Equipment |
| | 0.54 | RVR | 4033 | 12 | | | Lab | See Equipment | CE; ECS Department
Environmental Engineering Lab (This room only has a screen.) | | 0.54 | RVR | 3013 | 12 | | | Lab | Basic Smart |
| | 0.54 | RVR | 3017 | 12 | | | Lab | Basic Smart |
| | 0.54 | RVR | 5019 | 12 | | | Lab | See Equipment | ECS; EEE Department
Microwave and Wireless Communication Lab
| | 0.53 | AMD | 302 | 4 | | | Lab | See Equipment |
| | 0.53 | AMD | 303 | 4 | | | Lab | See Equipment |
| | 0.52 | RVR | 4001 | 10 | | | Lab | Basic Smart |
| | 0.52 | RVR | 4005 | 10 | | | Lab | See Equipment |
| | 0.52 | RVR | 5017 | 10 | | | Lab | See Equipment |
| | 0.51 | SCL | 1327 | 20 | | | Lab | See Equipment |
| | 0.51 | SCL | 1349 | 20 | | | Lab | See Equipment |
| | 0.49 | RVR | 1005 | 5 | | | Lab | See Equipment |
| | 0.49 | SCL | 1357 | 16 | | | Lab | See Equipment | ECS; ME Department
Energy System Lab
| | 0.49 | SCL | 1108 | 16 | | | Lab | See Equipment | ECS; EEE Department
Optical Engineering Lab
| | 0.49 | SCL | 1224 | 16 | | | Lab | See Equipment | CE; ECS Department
Hydraulics Lab
| | 0.48 | SCL | 1102 | 14 | | | Lab | See Equipment | ECS;EEE Department
Electronic Power Lab
| | 0.47 | SCL | 1118 | 12 | | | Lab | See Equipment |
| | 0.47 | EUR | 425 | 10 | | | Lab | See Equipment |
| | 0.45 | EUR | 423 | 8 | | | Lab | See Equipment |
| | 0.44 | SCL | 1119 | 8 | | | Lab | Basic Smart |
| | 0.00 | SHS | 113 | 415 | | | Lab | See Equipment | | | 0.00 | SQU | 426 | 24 | | | Lab | See Equipment | | | 0.00 | LSN | 2108 | 13 | | | Lab | See Equipment | | | 0.00 | AMD | 241 | 12 | | | Lab | See Equipment | | | 0.00 | SCL | 1101 | 20 | | | Lab | See Equipment | | | | ARC | 1010 | 72 | | 2005-09-01 | Lab | See Equipment | | | | ARC | 1011 | 50 | | 2005-09-01 | Lab | See Equipment | | | | LIB | 11 | 80 | 2011-10-31 | | Lab | Advanced Smart | | pic | | SCL | 1329 | 20 | | | Lab | See Equipment | | | | LIB | 1533 | 60 | | | Lab | Basic Smart |
| | | LIB | 1522 | 54 | | | Lab | Basic Smart |
| | | LIB | 53 | 48 | | | Lab | See Equipment |
| | | LIB | 2023 | 45 | | | Lab | Basic Smart |
| | | KDM | 268 | 26 | 2008-08-29 | | Lab | Basic Smart | The classroom belongs to the dean.
| | | LIB | 2024 | 0 | | | Lab | |
| |